Original source · versioned page text
SUPERSEDED Approved Document Fauna Management Plan v1 OPW25/0140
Plans and drawings: the text below has words only, no drawings.
Very large file (11.4 MB): may take a few minutes to open.
Fauna Management Plan 44 Hoy Road, Lake McDonald Action Task Responsibility Timing • Where the licensed Wildlife Spotter Catcher believes that a construction activity may impact on the welfare of wild animals, then the Wildlife Spotter Catcher may make an Animal Welfare Direction in respect of construction operations or activities. This direction may define the timing of actions or measures required to protect the welfare of animals likely to be affected by such operational works, activities or structures 3. Any breach of the direction may be considered to be a breach of this FMP. Pre-clearing • Initial clearing to involve slashing (or similar) of and clearing groundcover and midstory. Any hollow-bearing process trees and/or other significant habitat features identified during the initial site inspection will be retained. All under scrubbing works will be completed with a suitably qualified Wildlife Spotter Catcher in attendance. • After under scrubbing of each area is complete, non-habitat trees (i.e. trees other than those identified as habitat trees) will be cleared. Clearing of non-habitat trees will only occur where their removal will not impact on identified habitat trees (e.g. canopies do not interconnect with habitat trees). • After under scrubbing and clearing on non- habitat trees, an elevated work platform or cherry-picker will be used in conjunction with a chainsaw operator and suitably qualified Wildlife Spotter Catcher to inspect and remove hollows (if any identified). • When the fauna has been safely secured within its hollow (or compensatory habitat / nest box), the entire limb can then be placed in the cherry- picker bucket or lowered to the ground using ropes depending on the size of the limb. • The limb and/or compensatory habitat / nest box will then be placed in a cool, quiet location until translocation to the recipient habitat site, when at dusk the hollow entrance is re-opened to allow the fauna to emerge of its own accord. Directional • Directional vegetation clearing is to be Contractor, During vegetation employed. Specifically, clearing should begin at Wildlife Spotter vegetation clearing the north and progressively move towards the Catcher, Project / clearing south. Refer to Figure 3 for clearing areas and Site Manager direction of clearing. 3 An Animal Welfare Direction will only be used in circumstances in which the Wildlife Spotter Catcher considers that there exists a real and immediate risk to animal welfare. 28 | 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.