Original source · versioned page text
Planning Report
DANYA COOK TOWN PLANNING
4.6 Provision of Services and Stormwater
As mentioned above under Section 3.6 – Access and Services, the existing dwelling units are serviced by all urban infrastructure
services. Following issue of a successful Development Approval, these services will be extended to ensure the additional dwelling
unit is provided with an individual and secure connection to all urban infrastructure.
With respect to stormwater, the earthworks required for the crossover and driveway renewal will ensure overland flow and/or
flooding is not worsened, impeded, or otherwise diverted to adversely affect downstream properties or environments. Refer to the
Engineering Plans included at Appendix B.
4.7 Waste Management
The proposed development will be serviced by Council’s waste collection service. As such, residents will wheel bins to the kerbside
of Henderson Street for collection on the designated collection days. It is noted that kerbside collection is the current method
servicing the surrounding residential area of Sunshine Beach.
9
Planning Report October 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.