RFI response - Land Design Rehab Management Plan Pottery St

Attached to the e-mail RFI Response, land Design Rehab Management Plan - Re: 19660 - 30 Pottery St - Request to restart the clock for decision Making period - OPW26/0033.

of 7
                                                                                                                 •
                                     SPECIFICATIONS                                                              •
                                                                                                                      Be fully sun or shade hardened to suit their on-site growing position.
                                                                                                                      The contractor Is responsible for the quality of the plant stock and therefore should not
                                                                                                                                                                                                                            9. MAINTENANCE
                                                                                                                                                                                                                            The maintenance period commences at the date of Practical Completion of Works. During the
                                                                                                                      accept substandard stock from the Nursery/Supplier.                                                   maintenance period, best horticultural practices are to be maintained including (but not limited
All landscape construction works are to be undertaken in accordance with relevant council                        •    Advanced trees in 25L pot sizes or larger are to be staked with at least 2 hardwood stakes.           to) the following items: watering, weeding, fertilising, pest and disease control, mulching, pruning,
approvals and accepted industry best practice standards. Any variations to the approved design                        Stakes must not be driven through the root ball.                                                      rubbish removal and keeping the site neat and tidy.
documentation must receive prior approval from the project landscape designer before works
commence on site. The contractor is responsible for ensuring they are working from the latest                    Refer to Notes and Typical Advanced Tree Planting Detail on Sheet LD-03.                                   A General Maintenance Program Consists of:
revision of all documentation prior to tendering and construction. Full consideration must also be                                                                                                                          •   Undertaking regular routine maintenance visits at minimum monthly intervals throughout
given to all relevant Architectural, Civil, Hydraulic and Electrical Engineering documentation.
                                                                                                                 5. STREET TREE INSTALLATION                                                                                    the maintenance period.
                                                                                                                 All planting and landscaping shall be undertaken by a qualified landscape contractor. Refer to             •   Monitoring plant health, performance and signs of stress throughout the maintenance
PROJECT SCOPE OF WORKS:                                                                                          Street Tree Planting Notes on Sheet LD-03.                                                                     period and undertake appropriate remedial action where required. Soil moisture levels are
                                                                                                                                                                                                                                critical during the establishment phase; avoid overwatering planted areas.
   •    Preliminaries, OH&S Documentation and Dial Before You Dig.                                               All tree planting must be installed as per the following parameters:                                       •   Manual weed control and/or herbicide application carried out as required.
   •    Co-ordination with other Trades                                                                          •     0.7m minimum from the back of kerbs                                                                  •   Mowing all turf areas fortnightly.
   •    Topsoil Sampling and Analysis if using Site-Won Topsoil                                                  •     5m minimum from street lights                                                                        •   Pruning and shaping all shrubs and trees monthly, or as required to maintain healthy growth
   •    Excavation and Drainage of Planting Areas                                                                •     3m minimum from stormwater catchpits                                                                     and intended form in accordance with AS 4373:2007 – Pruning of Amenity Trees.
   •    Supply & Install Imported Topsoil or Soil Amelioration of Site-Won Topsoil                               •     3m from driveways                                                                                    •   Removing all tree stakes and ties once satisfactory establishment has been achieved and site
   •    Edging to Planting Areas                                                                                 •     1m from all underground services.                                                                        tradesman have concluded their activities and vacated the site.
   •    Street Tree Installation                                                                                                                                                                                            •   Fertilising all garden beds and street trees in accordance with manufacturers guidelines.
   •    Forest Mulch - Supply & Install                                                                          6. TURF                                                                                                    •   Topping up of mulch, rectifying defects, top dressing turf, replacing failed or under-
   •    Install Coir Netting to Bioretention Basin Batters                                                       Source turf from a specialist cultivated turf grower.                                                          performing plant stock at the end of the Maintenance Period.
   •    Planting of Bioretention Basin Batters
   •    Turf - Supply and Lay                                                                                    Turf Installation Requirements:                                                                                                    STREET TREE - PLANTING SCHEDULE
   •    Maintenance of Landscape Works (12 months)                                                               •     Supply and install “A” Grade turf in accordance with the Material Schedule, with a minimum
                                                                                                                                                                                                                                 CODE               BOTANICAL NAME                     COMMON NAME               SIZE     QTY
                                                                                                                       sod thickness of 25mm.
LANDSCAPE NOTES:                                                                                                 •     Turf is to be laid within 24 hours of cutting and on the day of delivery.
                                                                                                                                                                                                                              ACM hem         Acmena hemilampra                      Broad-leaved lillypilly     45L       10
                                                                                                                 •     Finished turf areas are to be evenly graded with appropriate falls directed to drainage points.        HAR pen         Harpullia pendula                      Tulipwood                   45L       10
1. SERVICES                                                                                                      •     Allow for all necessary ground preparation, including placement of 100mm of topsoil in                 TRI lau         Tristaniopsis laurina 'Luscious'       Watergum                    45L        6
The locations of all underground and overhead services shown on these drawings are indicative                          accordance with specification requirements.                                                            XAN chr         Xanthostemon chrysanthus               Golden Penda                45L       10
only and have been included for general information purposes at the design and Council approval                  •     Apply turf starter fertiliser prior to installation in accordance with the manufacturer’s                                                                                               TOTAL       36
stage. The Landscape Contractor is responsible for liaising with the Principal Contractor to confirm                   recommendations.
the as-constructed locations of all water, sewer, stormwater, electrical, communication and other                •     Lay turf parallel to slope contours with staggered, tightly butted joints to achieve a flush
existing services prior to the commencement of any excavation works. The Landscape Designer                            finish with adjoining surfaces.                                                                               BIO BASIN BATTERS – PLANTING SCHEDULE (115m2 at 3/m2)
accepts no liability for any damage to existing services, structures or infrastructure resulting from            •     Turf is to be installed 10mm proud of adjacent finished surfaces to allow for settlement of                BOTANICAL NAME                      COMMON NAME                        RATIO          QTY
construction activities or reliance on the information shown within these drawings.                                    topsoil and to ensure a flush finish at completion of the maintenance period.                          Banksia robur                     Swamp Banksia                             10%            34
                                                                                                                 •     Thoroughly water and roll turf following installation to eliminate undulations and ensure all
                                                                                                                                                                                                                              Gahnia aspera                     Saw Sedge                                 20%            69
2. SITE PREPARATION, EXCAVATION & DRAINAGE                                                                             joints are free of gaps. Top-dress any gaps or uneven areas with coarse washed sand.
                                                                                                                                                                                                                              Jacksonia scoparia                Winged Broom Pea                          10%            34
Eradicate all weeds from proposed planting beds and dedicated turfed areas. Remove debris from                   •     Maintain adequate moisture levels until turf is fully established and rooted. Provide
site. Excavate areas for new garden beds and new lawns to allow 300mm of topsoil for garden                            temporary barriers, including flagging tape, to prevent pedestrian or vehicle access to turf           Lomandra hystrix                  Matt Rush                                 20%            69
beds and 100mm for turfed areas. Cultivate existing ground to a minimum depth of 300mm for                             areas during establishment.                                                                            Melaleuca thymifolia              Honey Myrtle                              10%            34
garden beds. The landscape contractor is to ensure all levels provide sufficient drainage to                     •     Replace and relay any failed turf areas with new turf.                                                 Breynia oblongifolia              Coffee Bush                               10%            34
nominated points or to street drainage. Grade all turf and planting areas evenly away from                                                                                                                                    Imperata cylindrica               Blady Grass                               20%            69
structures and towards legal drainage points of discharge. Ponding is not acceptable.                            7. MULCH                                                                                                                                                                                  TOTAL        343
                                                                                                                 All mulch shall be free of rubbish, soil, weeds, rocks, twigs and other foreign matter. Finished
3. TOPSOIL                                                                                                       mulch levels are to be flush with adjacent finished surfaces, allowing for settlement of both topsoil
All soils are to comply with the requirements of AS 4419, including both site-won and imported                   and mulch materials. Mulch is to be kept clear of plant stems and trunks to prevent disease and                      BIO BASIN FLOOR – PLANTING SCHEDULE (129m2 at 8/m2)
topsoil. Topsoil to garden areas shall be installed to a minimum depth of 300mm and 100mm for                    rot.                                                                                                             BOTANICAL NAME                      COMMON NAME                        RATIO           QTY
turf areas. Preference is given to the reuse of suitable on-site material where available. Site topsoil                                                                                                                       Isolepis nodosa                   Knobby Club Rush                          30%            310
is to be sampled and tested for horticultural suitability and appropriately ameliorated where                    Provide aged, coarse chipped forest mulch comprising a blend of wood, bark and leaf material.
                                                                                                                                                                                                                              Lomandra hystrix                  Matt Rush                                 70%            722
required. Topsoil must be free of noxious weeds, rocks, roots, nut grass, rubbish, and any other                 Mulch shall be installed to a consistent minimum depth of 100mm unless noted otherwise.
deleterious material. Place all topsoil in the locations specified and as directed on site. Ensure that                                                                                                                                                                                                    TOTAL        1,032
the topsoil is spread and graded evenly to prevent any ponding. Prevent excess compaction during                 8. WATERING
construction works.                                                                                              As a benchmark, watering should be carried out daily for weeks 1-4, twice per week for weeks 5-
                                                                                                                 8, once per week for weeks 9-12 and then at the contractor’s discretion, to achieve acceptance
                                                                                                                                                                                                                                                     MATERIALS & FINISHES SCHEDULE
4. PLANT MATERIAL                                                                                                criteria.                                                                                                            ITEM                                   REQUIREMENTS
All Street Tree Stock Must:                                                                                                                                                                                                   Turf                    ‘A’ Grade Couch (refer detail LD-04)
•     Conform to the stock selection criteria outlined in AS2303:2018 – Tree Stock for Landscape                 Watering requirements beyond this establishment phase will be site specific depending on                     Edging                  Spade-Cut Edge (refer detail LD-04)
      Use and be certified by an independent arborist.                                                           weather conditions. Deep soaking is preferred over light watering to promote deep rooting. If
                                                                                                                                                                                                                              Mulch                   Forest Mulch (refer detail LD-04)
•     Be healthy and free of nutrient deficiencies, pests and disease.                                           soils are hydrophobic, a wetting agent can be applied.


                                                                                                          PROJECT        30 POTTERY ST, POMONA                                                          ISSUE      DATE    DESCRIPTION

                                                                         294 COLES CREEK RD,
                                                                           COORAN QLD 4569
                                                                                                          CLIENT         BRIAN NAISMITH DEVELOPMENT CONSULTANT                                            A     03/07/26   For Approval

                                                                         PHONE: 0417 619 457
                                                                                                                                                                                                                                                                                SHEET LD-03
                                                                      [email protected]
                                                                                                          DOC TITLE      LD-RMP POTTERY ST
                                                                       WWW.FLORAFIED.COM.AU
                                                                                                          DATE           03/07/2026                             DRAWN       JF      ISSUE       A

Log in to download the original (RFI response - Land Design Rehab Management Plan Pottery St.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.