3.4.3 Car Parking
The project should be timed to ensure traffic disruptions are minimised by excessive contractors
attending the site. Adequate staff parking shall be provided on the site and supplemented by lawful
street parking along the western side of Seaview Terrace.
3.4.4 Delivery Management
The project manager and contractors shall coordinate deliveries to prevent traffic disturbance. The
following shall be given consideration:
• Time of day and distance travelled for deliveries
• Size and weight of delivery
• Aids available for lifting of materials (crane, etc)
• Material storage location
The recommended delivery loading and unloading zone is in the road reserve fronting the property. No
parking or standing of contractor vehicles is permitted over yellow curb lines.
3.5 Communication Plan
The Project Manager is to communicate with relevant stakeholders to advise of agreed construction
times, impacts on traffic, services and other relevant issues. A preliminary communication protocol is
presented in Table 1.
Table 1: Preliminary Communication Protocol
Stakeholder Communication Timing
Emergency services Email of to notify of proposed At start and end of site works
(Noosa Heads Police Station, works and access points
Noosa Heads Fire & Rescue,
Noosa Heads Ambulance Service)
Residences in the end leg of Letter box drop of proposed 3-4 weeks prior to site works
Seaview Terrace works, expected time frames, site commencing
contact, agrees parking
arrangements and traffic impacts
Residences in the end leg of Notification of one-off temporary As required, with suitable notice
Seaview Terrace traffic condition changes (ie,
temporary blockage from large
delivery truck)
Residences in the end leg of Service interruptions (eg, As required, with suitable notice
Seaview Terrace and other electricity, water supply)
affected residences
Figure 6 outlines the location of the key neighbours.
Preliminary Construction and Environmental Management Plan 66 Seaview Terrace Sunshine Beach QLD 4567
Taylor Environmental (Australia) Pty Ltd Page 10 of 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
231031 - 66 Seaview Terrace - Construction Environmental Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.