231031 - 66 Seaview Terrace - Construction Environmental Management Plan · OPW23/0175
Attached to the e-mail Operational Works Application OPW23/0175 - DA Form 1, Plans, Construction Environment Management Plan - 66 Seaview Tce_ Sunshine Beach.
Plans and drawings: the text below has words only, no drawings.
3.4.2 Temporary Signage and Traffic Control Measures This property is located toward the end a no-through road, with 3 driveways beyond the site. As such, most of the traffic on the road will not need to pass the work site, however all construction vehicles and trucks will have to pass most properties in the street to reach the site. The effects to existing traffic and pedestrian activities due to the additional traffic during the works is to be minimised as much as reasonably possible. If traffic control is required, all required line marking, traffic cones, and physical protection such as water‐filled barriers or concrete jersey barriers will be in place in accordance with Manual of Uniform Traffic Control Devices (MUTCD). Some of the items to be implemented to manage traffic include: • Access routes to construction areas • Signage • Car parking • Notification protocols and time of operation Figure 5 below presents the proposed traffic guidance scheme for the works. Figure 5: Traffic guidance scheme Preliminary Construction and Environmental Management Plan 66 Seaview Terrace Sunshine Beach QLD 4567 Taylor Environmental (Australia) Pty Ltd Page 9 of 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
231031 - 66 Seaview Terrace - Construction Environmental Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.