231031 - 66 Seaview Terrace - Construction Environmental Management Plan · OPW23/0175

Attached to the e-mail Operational Works Application OPW23/0175 - DA Form 1, Plans, Construction Environment Management Plan - 66 Seaview Tce_ Sunshine Beach.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Table 6 contains the recommended strategies for waste management and minimisation for the site.
The is the responsible person and is to undertake regular monitoring.

Table 6: Waste Management and Minimisation
 Strategy                    Actions                                                                  Monitoring
 Minimise waste               • Purchase minimum necessary materials and packaging. Establish         • PM to conduct
 generation during              and maintain an inventory of waste materials                            regular audits
 construction phases          • Use adequately sized waste bins but ensure they are regularly
                                emptied.
 Maximize reuse and           • Provide and regularly monitor facilities for recycling of all         • PM to conduct
 recycling of waste             possible materials such as waste oils, paper, plastics, solvents,       regular audits
 during construction            metal, glass and wood by providing separate recycling bins.
                                Contract reputable waste management contractors to remove
                                items for recycling.
                              • Ensure all staff are familiar with reduce, reuse and recycle
                                practices.
                              • Provide information on the hierarchy of waste management at
                                staff training and site induction programs
 Establish effective          • Allocate and clearly identify collection areas and effective          • PM to conduct
 collection facilities          storage areas.                                                          regular audits
                              • Provide clearly marked recycling bins and other waste
                                receptacles.
                              • All waste pick-ups should occur in designated areas.
 Disposal of wastes           • Ensure all wastes generated on-site are disposed in an                • PM to conduct
                                appropriate manner at facilities licensed to accept the waste           regular audits
                                materials.
                              • Use waste manifest system as required for regulated wastes by
                                the Department of Environment and Heritage Protection.




4.5     Flora and Fauna Protection
The existing property is treed and bound by treed land to the north and east. Table 7 indicates the
recommended strategies for flora and fauna protection. The Project Manager is the responsible person
and is to undertake regular monitoring.

Table 7: Flora and Fauna Protection
 Strategy                    Actions                                                                  Monitoring
 Minimise disturbance of      • All areas of vegetation not to be disturbed shall be clearly and      • Regular visual
 sensitive areas                visibly marked at the start of each construction phase to ensure        inspections by PM
                                construction activities, including vehicle movement, equipment
                                storage etc. do not enter or encroach on marked areas.
                              • All trees to be retained within or adjacent to construction areas
                                are to be clearly marked using flagging tape.
 Obtain appropriate           • Appropriate OPW approvals to be gained prior to vegetation            • PM to ensure
 permits for any                removal                                                                 appropriate
 vegetation removal                                                                                     approvals are in
                                                                                                        place
 Fauna Care                   • Transport any native fauna injured during works to a native           • PM to facilitate
                                animal hospital or refuge                                               care if needed
                              • RSPCA Location: Cnr Hollett and, W Eumundi Rd, Noosaville QLD
                                4562
 Weed Eradication &           • Locate and eradicate declared plants by suitably qualified and        • Regular visual
 Controls                       experienced persons.                                                    inspections by PM
                              • Separate weeds from vegetation shredding activities to prevent
                                spread/regrowth of weeds.
 Re-vegetation                • All disturbed areas should be stabilized or rehabilitated at          • Regular visual
 /Rehabilitation                completion of works on that area. Implement interim controls            inspections by PM
                                where extended periods are likely.

Preliminary Construction and Environmental Management Plan                      66 Seaview Terrace Sunshine Beach QLD 4567
Taylor Environmental (Australia) Pty Ltd                                                                      Page 15 of 38

Used in these records

About this file

File size
4.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

231031 - 66 Seaview Terrace - Construction Environmental Management Plan.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.