231031 - 66 Seaview Terrace - Construction Environmental Management Plan · OPW23/0175
Attached to the e-mail Operational Works Application OPW23/0175 - DA Form 1, Plans, Construction Environment Management Plan - 66 Seaview Tce_ Sunshine Beach.
Plans and drawings: the text below has words only, no drawings.
Table 6 contains the recommended strategies for waste management and minimisation for the site.
The is the responsible person and is to undertake regular monitoring.
Table 6: Waste Management and Minimisation
Strategy Actions Monitoring
Minimise waste • Purchase minimum necessary materials and packaging. Establish • PM to conduct
generation during and maintain an inventory of waste materials regular audits
construction phases • Use adequately sized waste bins but ensure they are regularly
emptied.
Maximize reuse and • Provide and regularly monitor facilities for recycling of all • PM to conduct
recycling of waste possible materials such as waste oils, paper, plastics, solvents, regular audits
during construction metal, glass and wood by providing separate recycling bins.
Contract reputable waste management contractors to remove
items for recycling.
• Ensure all staff are familiar with reduce, reuse and recycle
practices.
• Provide information on the hierarchy of waste management at
staff training and site induction programs
Establish effective • Allocate and clearly identify collection areas and effective • PM to conduct
collection facilities storage areas. regular audits
• Provide clearly marked recycling bins and other waste
receptacles.
• All waste pick-ups should occur in designated areas.
Disposal of wastes • Ensure all wastes generated on-site are disposed in an • PM to conduct
appropriate manner at facilities licensed to accept the waste regular audits
materials.
• Use waste manifest system as required for regulated wastes by
the Department of Environment and Heritage Protection.
4.5 Flora and Fauna Protection
The existing property is treed and bound by treed land to the north and east. Table 7 indicates the
recommended strategies for flora and fauna protection. The Project Manager is the responsible person
and is to undertake regular monitoring.
Table 7: Flora and Fauna Protection
Strategy Actions Monitoring
Minimise disturbance of • All areas of vegetation not to be disturbed shall be clearly and • Regular visual
sensitive areas visibly marked at the start of each construction phase to ensure inspections by PM
construction activities, including vehicle movement, equipment
storage etc. do not enter or encroach on marked areas.
• All trees to be retained within or adjacent to construction areas
are to be clearly marked using flagging tape.
Obtain appropriate • Appropriate OPW approvals to be gained prior to vegetation • PM to ensure
permits for any removal appropriate
vegetation removal approvals are in
place
Fauna Care • Transport any native fauna injured during works to a native • PM to facilitate
animal hospital or refuge care if needed
• RSPCA Location: Cnr Hollett and, W Eumundi Rd, Noosaville QLD
4562
Weed Eradication & • Locate and eradicate declared plants by suitably qualified and • Regular visual
Controls experienced persons. inspections by PM
• Separate weeds from vegetation shredding activities to prevent
spread/regrowth of weeds.
Re-vegetation • All disturbed areas should be stabilized or rehabilitated at • Regular visual
/Rehabilitation completion of works on that area. Implement interim controls inspections by PM
where extended periods are likely.
Preliminary Construction and Environmental Management Plan 66 Seaview Terrace Sunshine Beach QLD 4567
Taylor Environmental (Australia) Pty Ltd Page 15 of 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
231031 - 66 Seaview Terrace - Construction Environmental Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.