4.6     Noise and Air Controls
The objective of this strategy is to ensure that construction activities do not cause disturbance to
neibouring residents from noise or air emissions. Table 8 indicates the recommended strategies for
noise and air quality control. The Project Manager is the responsible person and is to undertake regular
monitoring.

Table 8: Noise and Air Quality Control Strategies
Strategy                    Actions                                                                 Monitoring
Minimise plant and           • Ensure regular maintenance according to manufacturer's schedule. • Regular monitoring by
equipment noise              • Ensure all plant and equipment is fitted with noise suppression          PM
                               devices.                                                               • Regularly monitor
                             • Opertae only during approved hours                                       performance &
                             • Schedule noisy activities for times when least disturbance will be       activities to prevent
                               caused                                                                   unnecessary noise.
                             • Provide prior notification to neighbours of activities as appropriate. • Undertake Noise
                             • Attend promptly to any complaints.                                       Measurement when
                             • Complete Environmental Complaints Register                               required
Minimise plant and           • Ensure regular maintenance according to manufacturer's schedule. • Maintenance records
equipment emissions                                                                                     to be available for
                                                                                                        inspection by PM
Minimise dust                • Stabilize or cover exposed areas/stockpiles with turf, mulch or        • Visual observation by
                               other approved treatment.                                                PM
                             • Ensure exposed areas and vehicle routes are dampened during            • Regularly monitor
                               works                                                                    activities to prevent
                             • Cover loads during transport                                             unnecessary dust
                             • Rinse transport vehicles before exiting site.                            emissions or waste
                                                                                                        disposal activities.
                                                                                                      • Undertake Air Quality
                                                                                                        Monitoring (AS/NZS)
                                                                                                        when required (in
                                                                                                        response to
                                                                                                        complaint).
Smoke                        • No burning permitted.                                                  • Visual observation by
                             • Provide facilities & arrange disposal of all on-site wastes during       PM
                               occupancy and construction activities. Ensure all site personnel are
                               informed that burning is not permitted.




4.7     Amenity
The general objective of these strategies is to ensure that the construction does not create adverse
impact on the site or neighbouring properties with regard to intrusion, traffic access and property
access activities, parking, litter, weeds and public safety issues. Table 9 indicates the recommended
strategies for managing amenity issues.

Table 9: Amenity Issues Management Strategy
Strategy                Actions                                                                 Monitoring
Minimise visual          • Inspect and remove litter daily                                    • Regular site inspections
impact                   • Implement weed control over construction site                        and implementation of
                         • Maintain site in tidy condition                                      appropriate site
                                                                                                management and
                                                                                                maintenance practices.
                                                                                              • Visual observation by PM.
Minimise intrusion       • No entry of neighbouring properties unless prior consent has been • Evidence of consent to be
                           obtained where required.                                             provided to PM prior to
                         • Manage construction activities to avoid intrusion of neighbouring    entry to properties.
                           properties.
Traffic impacts and      • Ensure travel routes, employee parking, site access and deliveries • Visual observation and
site access                do not cause traffic restrictions or safety hazards.                 review of
Preliminary Construction and Environmental Management Plan                     66 Seaview Terrace Sunshine Beach QLD 4567
Taylor Environmental (Australia) Pty Ltd                                                                     Page 16 of 38

Used in these records

About this file

File size
4.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

231031 - 66 Seaview Terrace - Construction Environmental Management Plan.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.