4.6 Noise and Air Controls
The objective of this strategy is to ensure that construction activities do not cause disturbance to
neibouring residents from noise or air emissions. Table 8 indicates the recommended strategies for
noise and air quality control. The Project Manager is the responsible person and is to undertake regular
monitoring.
Table 8: Noise and Air Quality Control Strategies
Strategy Actions Monitoring
Minimise plant and • Ensure regular maintenance according to manufacturer's schedule. • Regular monitoring by
equipment noise • Ensure all plant and equipment is fitted with noise suppression PM
devices. • Regularly monitor
• Opertae only during approved hours performance &
• Schedule noisy activities for times when least disturbance will be activities to prevent
caused unnecessary noise.
• Provide prior notification to neighbours of activities as appropriate. • Undertake Noise
• Attend promptly to any complaints. Measurement when
• Complete Environmental Complaints Register required
Minimise plant and • Ensure regular maintenance according to manufacturer's schedule. • Maintenance records
equipment emissions to be available for
inspection by PM
Minimise dust • Stabilize or cover exposed areas/stockpiles with turf, mulch or • Visual observation by
other approved treatment. PM
• Ensure exposed areas and vehicle routes are dampened during • Regularly monitor
works activities to prevent
• Cover loads during transport unnecessary dust
• Rinse transport vehicles before exiting site. emissions or waste
disposal activities.
• Undertake Air Quality
Monitoring (AS/NZS)
when required (in
response to
complaint).
Smoke • No burning permitted. • Visual observation by
• Provide facilities & arrange disposal of all on-site wastes during PM
occupancy and construction activities. Ensure all site personnel are
informed that burning is not permitted.
4.7 Amenity
The general objective of these strategies is to ensure that the construction does not create adverse
impact on the site or neighbouring properties with regard to intrusion, traffic access and property
access activities, parking, litter, weeds and public safety issues. Table 9 indicates the recommended
strategies for managing amenity issues.
Table 9: Amenity Issues Management Strategy
Strategy Actions Monitoring
Minimise visual • Inspect and remove litter daily • Regular site inspections
impact • Implement weed control over construction site and implementation of
• Maintain site in tidy condition appropriate site
management and
maintenance practices.
• Visual observation by PM.
Minimise intrusion • No entry of neighbouring properties unless prior consent has been • Evidence of consent to be
obtained where required. provided to PM prior to
• Manage construction activities to avoid intrusion of neighbouring entry to properties.
properties.
Traffic impacts and • Ensure travel routes, employee parking, site access and deliveries • Visual observation and
site access do not cause traffic restrictions or safety hazards. review of
Preliminary Construction and Environmental Management Plan 66 Seaview Terrace Sunshine Beach QLD 4567
Taylor Environmental (Australia) Pty Ltd Page 16 of 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
231031 - 66 Seaview Terrace - Construction Environmental Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.