Skip to the record
Beware of cheap imitations.

Council archive · source document

231031 - 66 Seaview Terrace - Construction Environmental Management Plan · OPW23/0175

Attached to the e-mail Operational Works Application OPW23/0175 - DA Form 1, Plans, Construction Environment Management Plan - 66 Seaview Tce_ Sunshine Beach.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
5     Incidents and Reporting
5.1       Incidences
Incidents, emergencies, or deviations from this CEMP are classified as non-conformances. Non-
conformance events shall be treated in the following manner:

      1. Notify the Project Manager
      2. Record time, date, nature and corrective actions proposed to be provided to the Project
         Manager within twenty-four hours
      3. The Project Manager shall liaise with relevant authorities to confirm the nature of any
         corrective action required.
      4. Corrective action implemented
      5. The incident report form finalised


5.2       Reporting
The Contractor shall liaise with the Department of Environment and Science when a non-conformance
event resulting in environmental harm or risk has been reported. This advice shall include information
on:

      •    The location of the incident
      •    The time the incident occurred
      •    The nature of environmental harm
      •    Mitigation/control measures implemented
      •    Success of initial actions
      •    Contact details of contractor
      •    Contact details of person reporting incident

The following forms are presented in this CEMP:

      •    Appendix B:                   Form 1 Incident Report
      •    Appendix C:                   Form 2 Environmental Incident Report
      •    Appendix D:                   Form 3 Daily Log Sheet
      •    Appendix E:                   Form 4 Stormwater Management, Erosion and Sediment Control




Preliminary Construction and Environmental Management Plan           66 Seaview Terrace Sunshine Beach QLD 4567
Taylor Environmental (Australia) Pty Ltd                                                           Page 18 of 38

Used in these records

About this file

File size
4.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

231031 - 66 Seaview Terrace - Construction Environmental Management Plan.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.