Skip to the record
The only place to find full transcripts.

Council archive · source document

231031 - 66 Seaview Terrace - Construction Environmental Management Plan · OPW23/0175

Attached to the e-mail Operational Works Application OPW23/0175 - DA Form 1, Plans, Construction Environment Management Plan - 66 Seaview Tce_ Sunshine Beach.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Strategy                Actions                                                                  Monitoring
                           • Ensure access to neighbouring properties is not restricted.            records/permits/approval
                           • Obtain Local Authority permits where required.                         s by PM.
                           • Ensure close supervision & continually review/inspect measures
                             regularly.
                           • Attend promptly to any complaints.
Public Safety and          • Liaise with PM and Council on public safety requirements.            • Visual observation and
Community Issues           • Liaise with neighbours concerning issues. Record complaints            review of records by PM.
                             (Appendix C), outcomes and actions.
                           • Ensure close supervision & continually review and inspect public
                             safety measures regularly.
                           • Ensure appropriate procedures & processes for complaints are
                             implemented and communication lines are clearly established.
                           • Attend promptly to complaints.




4.8     Cultural Heritage
The overall objective of the strategies outlined below is to minimise the potential for any impacts to
Cultural Heritage. Table 10 indicates the recommended strategies for Cultural Heritage Protection.

Table 10: Cultural Heritage Protection
Strategy                      Actions                                                                     Monitoring
Protection of Aboriginal      • Cease operations immediately if any Aboriginal, archaeological, or      • Visual observation
Cultural Heritage               historic item or places may be identified, located or exposed during the and review of
                                course of the development.                                                records by PM.
                              • Notify Qld Government Cultural Heritage Unit for advice.
                              • Record any instances where potentially protected areas are
                                encountered, and actions taken.




Preliminary Construction and Environmental Management Plan                       66 Seaview Terrace Sunshine Beach QLD 4567
Taylor Environmental (Australia) Pty Ltd                                                                       Page 17 of 38

Used in these records

About this file

File size
4.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

231031 - 66 Seaview Terrace - Construction Environmental Management Plan.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.