Council archive · source document
231031 - 66 Seaview Terrace - Construction Environmental Management Plan · OPW23/0175
Attached to the e-mail Operational Works Application OPW23/0175 - DA Form 1, Plans, Construction Environment Management Plan - 66 Seaview Tce_ Sunshine Beach.
Plans and drawings: the text below has words only, no drawings.
Strategy Actions Monitoring
• Ensure access to neighbouring properties is not restricted. records/permits/approval
• Obtain Local Authority permits where required. s by PM.
• Ensure close supervision & continually review/inspect measures
regularly.
• Attend promptly to any complaints.
Public Safety and • Liaise with PM and Council on public safety requirements. • Visual observation and
Community Issues • Liaise with neighbours concerning issues. Record complaints review of records by PM.
(Appendix C), outcomes and actions.
• Ensure close supervision & continually review and inspect public
safety measures regularly.
• Ensure appropriate procedures & processes for complaints are
implemented and communication lines are clearly established.
• Attend promptly to complaints.
4.8 Cultural Heritage
The overall objective of the strategies outlined below is to minimise the potential for any impacts to
Cultural Heritage. Table 10 indicates the recommended strategies for Cultural Heritage Protection.
Table 10: Cultural Heritage Protection
Strategy Actions Monitoring
Protection of Aboriginal • Cease operations immediately if any Aboriginal, archaeological, or • Visual observation
Cultural Heritage historic item or places may be identified, located or exposed during the and review of
course of the development. records by PM.
• Notify Qld Government Cultural Heritage Unit for advice.
• Record any instances where potentially protected areas are
encountered, and actions taken.
Preliminary Construction and Environmental Management Plan 66 Seaview Terrace Sunshine Beach QLD 4567
Taylor Environmental (Australia) Pty Ltd Page 17 of 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
231031 - 66 Seaview Terrace - Construction Environmental Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.