Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

231031 - 66 Seaview Terrace - Construction Environmental Management Plan · OPW23/0175

Attached to the e-mail Operational Works Application OPW23/0175 - DA Form 1, Plans, Construction Environment Management Plan - 66 Seaview Tce_ Sunshine Beach.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
1     Introduction
1.1     Background
This Preliminary Construction and Environment Management Plan (CEMP) has been prepared for the
proposed works at 66 Seaview Terrace, Sunshine Beach, QLD 4567 in accordance with Advisory Note 4
of the MCU/2021/0212 Development Approval issued by Noosa Council on 15 September 2022. This
Preliminary Plan is to be submitted to Council with the Operational Works application. A final CMP is to
be submitted to Council at the Pre-Start meeting for the project.

The plan will provide guidelines for the works to be planned, coordinated and undertaken to a suitable
level to achieve the objectives of all relevant stakeholders, including the neighbours.


1.2     Purpose
The Plan details the measures to be adopted that will address identified impacts of the Project. The
purpose of this report is to:
   • Provide a framework for establishing best practice management standards to mitigate
        potential environmental harm
   • Provide mechanism to reduce the potential impacts of construction and maintenance activities
        on the adjoining properties
   • Provide a framework to identify and control risks specific to the construction of this project




Preliminary Construction and Environmental Management Plan       66 Seaview Terrace Sunshine Beach QLD 4567
Taylor Environmental (Australia) Pty Ltd                                                        Page 4 of 38

Used in these records

About this file

File size
4.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

231031 - 66 Seaview Terrace - Construction Environmental Management Plan.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.