231031 - 66 Seaview Terrace - Construction Environmental Management Plan · OPW23/0175
Attached to the e-mail Operational Works Application OPW23/0175 - DA Form 1, Plans, Construction Environment Management Plan - 66 Seaview Tce_ Sunshine Beach.
Plans and drawings: the text below has words only, no drawings.
2.3 Proposed Works
The existing site is vacant and treed. The proposed works include:
• Site establishment
• Clearing of trees
• Earthworks/excavations
• Infrastructure installation (water, sewer, electrical)
• Structure works, including slabs, frames and roof
• Internal fit out
• Driveways and hardscapes
• Landscaping and external fitout
• Finishing and tidying
The duration of each component is to be determined by the Project Manager prior to site works
commencing.
Figure 2 shows an aerial view of the existing site.
Figure 2: Existing site
2.4 Key Considerations
The works should be undertaken with the following key considerations:
• Ensure the works meet the needs and standards of the stakeholder, particularly the owner,
neighbours and Council
• Minimise disturbance to surrounding neighbours during the entire works form noise, dust and
traffic
• Ensure the safety of the workers and public during the entire work
Preliminary Construction and Environmental Management Plan 66 Seaview Terrace Sunshine Beach QLD 4567
Taylor Environmental (Australia) Pty Ltd Page 6 of 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
231031 - 66 Seaview Terrace - Construction Environmental Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.