Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

231031 - 66 Seaview Terrace - Construction Environmental Management Plan · OPW23/0175

Attached to the e-mail Operational Works Application OPW23/0175 - DA Form 1, Plans, Construction Environment Management Plan - 66 Seaview Tce_ Sunshine Beach.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
3     Construction Management
3.1     Security and Access
This site is located towards the end of Seaview Terrace in a cul-de-sac, with a pedestrian access path
from the street to the beach outside the northern boundary. The land beyond the eastern boundary
does not form part of the property and is to be restricted. The site access for the works will be Seaview
Terrace. It is understood that houses in the street are used for a combination of permanent residents
and short term rentals.

During site establishment, the Project Manager is to clearly identify the extent of the work site and
erect secure and safe temporary fence with appropriate access and egress points. Signage is to be hung
on the fence to notify:
    • Site is a construction zone
    • Entry and exit points
    • Site contact/responsible person
    • Expected timeframes of work
    • Required PPE
    • Any other information that the contractor deems relevant or important

The Project Manager is to ensure the gates are secured at the closing of each working day to prevent
unintended access to the construction site.


3.2     Safety
The principal consultant is responsible for preparing a Work Health and Safety Management Plan that
is specific to this project and its associated components, and that complies with their internal policies
and relevant legalisation.
Pre-start/induction meetings are to be held for all site staff and subcontractors prior to commencing
works. Topics covered shall include, at minimum:
     • Site access and parking
     • Work times
     • Emergency procedures and evacuation routes
     • First aid givers and facilities
     • Location of staff facilities such as amenities
     • Material storage and handling
     • Noise and dust suppression
     • Environmental management

The Project Manager shall request and review SWMS from the subcontractors to ensure compliance
with the Work Health and Safety Management Plan.


3.3     Work Hours
The standard hours of operation are 6:30am to 6:30pm, Monday to Saturday excluding public holidays,
as permitted under the Environmental Protection Act 1994.




Preliminary Construction and Environmental Management Plan        66 Seaview Terrace Sunshine Beach QLD 4567
Taylor Environmental (Australia) Pty Ltd                                                         Page 7 of 38

Used in these records

About this file

File size
4.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

231031 - 66 Seaview Terrace - Construction Environmental Management Plan.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.