Original source · versioned page text
Development Assessment Report
PROJECT URBAN – 22070 October 2022 5.10 SUSTAINABILITY A Sustainability Strategy prepared by Cundall is attached. This report has been prepared as the project aims to encapsulate sustainable design and operation to minimise carbon emissions, water consumption and waste generation, while enhancing the natural environment and providing a comfortable environment. The report outlines the Ecological Sustainable Design (ESD) strategy for the proposed development. While there are no direct sustainability planning requirements or metrics to be achieved, the development team is cognisant of the sustainability initiatives within the Noosa Plan 2020 and Noosa Council’s sustainability commitments, including their Carbon Neutral target. The sustainability strategy has been positioned to enable the achievement of Carbon Neutral certification in operation. 5.11 WASTE An Operational Waste Management Plan prepared by TTM Consulting is attached. This report undertakes an assessment of the likely waste generation of the proposed use and provides a guide for the design, construction and operational phases of the development to ensure compliance with the planning scheme requirements. DEVELOPMENT ASSESSMENT REPORT Page 15 Other Change - Material Change of Use 3 - 7 Serenity Close, Noosa Heads
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.