Development Assessment Report
Environment, heritage and scenic amenity
Performance Outcomes Acceptable Outcomes Comment
Environment, heritage and scenic amenity
PO24 AO24.1 Performance Outcome
Development: Cut or fill is less than 1.5 metres in Refer Development Assessment
(a) does not impact on landscape depth relative to the ground level. Report.
amenity;
(b) has minimal impact on the AO24.2 Complies
natural landform of the site; Development does not result in The development will not result in
(c) does not lead to erosion or the sediment or other material sediment or other materials being
transport of sediments off site; including building materials or waste deposited into road reserve,
and products being deposited or released stormwater or adjacent properties.
(d) does not lead to the disturbance into the road reserve, stormwater The development will be undertaken
of natural features, buildings or drain or adjacent properties. in accordance with a sediment
structures of cultural heritage control plan to be prepared and
significance. approved at operational works stage.
AO24.3 Not Applicable
Development on a site adjoining The site does not site adjoining
a local heritage place respects the a local heritage place.
cultural heritage significance of the
place by mitigating any adverse
impacts on the setting or integrity of
the heritage values.
PO25 AO25.1 Complies
Development on sloping sites: Buildings and structures are not Development area site slope is less
(a) is visually responsive to the constructed on land with a slope than 25%.
natural topography and sits within greater than 25% to protect scenic
the landscape rather than amenity and other landscape
dominating it; and qualities.
(b) steps down slopes or uses
suspended floor construction, AO25.2 Complies
minimising cut and fill and On sloping sites, split-level buildings, Buildings are spilt level and step
avoiding benching of the site. with small floorplates, that step down down the slope.
the slope are used as an alternative
to slab on ground construction to
minimise building bulk and benching
of the sites.
Editor's note- Refer to Figure 6.9.1A
and Figure 6.9.1B
AO25.3 Complies
The distance between the ground Only basement levels are below the
level and the lowest part of the floor 3m distance.
of the building does not exceed 3
metres.
Earthworks and drainage
Performance Outcomes Acceptable Outcomes Comment
Earthworks and drainage
PO26 AO26 Complies
Filling and excavation for operational Filling and excavation for operation All Filling and excavation will be
works do not directly, indirectly or works are designed and constructed designed and constructed to ensure
cumulatively cause adverse impacts to ensure overland flow and/or appropriate overland flow outcomes.
external to the development site by: flooding is not worsened, impeded, or This will be addressed with the
(a) causing ponding of water on otherwise diverted to adversely affect subsequent operational works
the site or nearby land; other properties or downstream application.
(b) increasing flooding, which environments.
adversely affects the safety or
use of any land upstream or
downstream; or
(c) adversely affecting the flow of
water in any overland flow path.
See the original