6.1.1 Existing Catchments
The existing site consists of a single lot with a dwelling, with landscaped ground areas. The existing
surface generally falls to the west towards the rear boundary. Roof runoff from existing dwellings
appears to discharge directly to ground level.
The total impervious area has been estimated using the detailed site survey and was found approximately
5% Impervious Area (Fi = 0.05) which equates to approximately 105m2.
The existing site catchment is as follows.
- Area – 0.203 Ha
- Tc – 12 mins
- Fraction Impervious (Fi) – 0.05
Peak flow rates for the median design storm for the existing site are given in Table 6.3
Table 6.3 – Existing Site Peak Flow Rates
Storm Q1 Q2 Q5 Q10 Q20 Q50 Q100
Event (1EY) (0.5EY) (0.2EY) (10%AEP) (5%AEP) (2%AEP) (1%AEP)
(L/s) (L/s) (L/s) (L/s) (L/s) (L/s) (L/s)
Existing 24 33 45 56 69 83 95
Peak Flow
Rate
6.1.2 Proposed Site
The development consists of the construction of 10 residential townhouses along with a shared access
driveway and ground level landscaping/ courtyards. The total pervious area for the site was calculated
to be approximately 680m2 which equates to a fraction impervious of 0.67.
The Developed site catchment is as follows.
- Area – 0.203 Ha
- Tc – 6 mins
- Fraction Impervious (Fi) – 0.67
Peak flow rates for the median design storms for the developed site are given in Table 6.4
Table 6.4 – Developed Site Peak Flow Rates
Storm Q1 Q2 Q5 Q10 Q20 Q50 Q100
Event (1EY) (0.5EY) (0.2EY) (10%AEP) (5%AEP) (2%AEP) (1%AEP)
(L/s) (L/s) (L/s) (L/s) (L/s) (L/s) (L/s)
Developed
Peak Flow
Rate 40 50 62 69 83 102 118
SCG Consulting Engineers Page 12 SCG Ref: 33114(SWMP)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.