LATE RFI - SCG 33114 (SWM) Rev A

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 17, section 1. The text section number identifies this passage in the reader.

6.2      Proposed Drainage
The proposed site drainage is detailed in drawings SCG 33114 - SW1.1 SW1.3 (Appendix D) and is
discussed below.
As defined in the Noosa Plan 2020 stormwater drainage must be designed in accordance with QUDM
2017, therefore the following design storms were adopted: -


         1.     Minor Drainage System     -       10% AEP ARI (Q10 Storm)
         2.     Major Drainage System     -        1% AEP ARI (Q100 Storm)




SCG Consulting Engineers                Page 15                              SCG Ref: 33114(SWMP)
Log in to download the original file

LATE RFI - SCG 33114 (SWM) Rev A.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.