6.2 Proposed Drainage
The proposed site drainage is detailed in drawings SCG 33114 - SW1.1 SW1.3 (Appendix D) and is
discussed below.
As defined in the Noosa Plan 2020 stormwater drainage must be designed in accordance with QUDM
2017, therefore the following design storms were adopted: -
1. Minor Drainage System - 10% AEP ARI (Q10 Storm)
2. Major Drainage System - 1% AEP ARI (Q100 Storm)
SCG Consulting Engineers Page 15 SCG Ref: 33114(SWMP)