LATE RFI - SCG 33114 (SWM) Rev A

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

Table of Contents
1.0       INTRODUCTION ................................................................................................................................... 2
2.0       EXISTING SITE DESCRIPTION ......................................................................................................... 3
3.0       PROPOSED DEVELOPMENT ............................................................................................................. 4
4.0       EXISTING DRAINAGE.......................................................................................................................... 5
   4.1        Existing Drainage and Infrastructure .................................................................................................... 5
   4.2        Lawful Point of Discharge ........................................................................................................................... 5
5.0       STORMWATER QUALITY .................................................................................................................. 7
   5.1        State Planning Policy and Water by Design Assessment ................................................................. 7
   5.2        Construction Phase ....................................................................................................................................... 7
      5.2.1       Silt and Sediment Erosion ...................................................................................................................................... 7
   5.3        Completed Development............................................................................................................................. 9
6.0       STORMWATER QUANTITY ............................................................................................................ 11
   6.1        Drains Analysis ............................................................................................................................................ 11
      6.1.1       Existing Catchments .............................................................................................................................................. 12
      6.1.2       Proposed Site ............................................................................................................................................................ 12
      6.1.3       Peak Flow Comparison ......................................................................................................................................... 13
      6.1.3       Peak Flow Mitigation (OSD) ............................................................................................................................... 13
   6.2        Proposed Drainage .................................................................................................................................... 15
7.0       FLOODING ........................................................................................................................................... 16
8.0       CONCULSION ...................................................................................................................................... 17
APPENDIX A – Detailed Site Survey ........................................................................................................ 18
APPENDIX B – Noosa Council Drainage Infrastructure ................................................................... 19
APPENDIX C – Proposed Development Plans ...................................................................................... 20
APPENDIX D – Concept Stormwater Management Plan .................................................................. 21




SCG Consulting Engineers                                                  Page 1                                                                     SCG Ref: 33114(SWMP)
Log in to download the original file

LATE RFI - SCG 33114 (SWM) Rev A.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.