LATE RFI - SCG 33114 (SWM) Rev A
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
1.0 INTRODUCTION SCG Consulting Engineers have been commissioned by Davrus Pty Ltd to complete a Stormwater Management Plan (SWMP) for a residential development at Lot 1 on RP203032, 20 Kauri Street, Cooroy The proposed development involves the construction of 10 Townhouses. The objective of this (SWMP) is to demonstrate that the following measures will be incorporated into the design and construction of the development: • Maintain stormwater quality – Protect receiving waters (during and post construction) • Manage stormwater peak flow rates of runoff and existing flow path characteristics. • Protect against flooding. • Adopt Water Sensitive Urban Design (WSUD) principles throughout. • Implement Stormwater Harvesting and re-use for landscaping. This report should be read in conjunction with our detailed site stormwater management plans (Appendix D drawing (No.) (SCG 33114 - SW1.1 thru SW1.3) The proposed development has been assessed against the following guidelines and planning documents: • Queensland Urban Drainage Manual 2017 (QUDM) • Water Sensitive Urban Design (WSUD) – Technical Design, Guidelines for South-East Queensland • Noosa Council Planning Scheme - Noosa Plan 2020 • AS/NZS 3500.3:2018 – Plumbing and Drainage Part 3 – Stormwater Drainage • State Planning Policy 2017 • Sunshine Coast Council – Flooding & Stormwater Management Guidelines V1 - 2020. SCG Consulting Engineers Page 2 SCG Ref: 33114(SWMP)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.