Original source · versioned page text
LATE RFI - SCG 33114 (SWM) Rev A
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
4.0 EXISTING DRAINAGE
4.1 Existing Drainage and Infrastructure
Data obtained from Noosa Council’s Interactive Mapping, accompanied with a detailed site survey
prepared by Noosa Cooloola Land Surveys confirms the following drainage infrastructure along the rear
boundary of the site: -
• A drainage reserve consisting of an open channel.
• An underground drainage network in the Kauri St Road reserve
Refer to Appendix A for the detailed site survey & Appendix B for Noosa Council Drainage
Infrastructure.
4.2 Lawful Point of Discharge
The lawful point of discharge is described in Section 3.9.1 of QUDM 2017. The ‘Lawful Point of
Discharge Test’ may be helpful in assessing whether a lawful point of discharge exists at a particular
location. As defined in QUDM 2017 the criteria for determining the lawful point of discharge are: -
1. Will the proposed development alter the site’s stormwater discharge characteristics in a
manner that may substantially damage a third party property (see section 3.6).
• If not, then no further steps are required to obtain tenure for a lawful point of
discharge (assuming any previous circumstances and changes were lawful).
• If there is a reasonable risk of such damage, then consider issue (2) or (3).
2. Is the location of the discharge from the development site under the lawful control of the
local government or other statutory authority from whom permission to discharge has
been received? This will include a park, watercourse, drainage or road reserve,
stormwater registered drainage easement, or land held by local government (including
freehold land).
Note: The regulatory authority (in its capacity as land holder) is likely to require
information about the potential impact of the site’s stormwater discharge characteristics
on third party properties (particularly those downstream of the proposed discharge point)
before it will consent to the discharge entering its land.
• If so, then no further steps are required to obtain tenure for a lawful point of
discharge.
• If not, then consider issue (3). A land owner or regulator may require that the
developer obtain an authority to discharge as described in (3) in order for the
stormwater to ultimately flow to a location described in (2).
3. An authority to discharge over affected properties will be necessary. In descending order
of certainty, an authority may be in the form of:
• Dedication of a drainage reserve or park
• A registered easement for stormwater discharge/works
• Written discharge approval.
Note: Some authorities may not accept a written approval from a current land owner
because a subsequent purchaser will not be bound by the previous owner’s letter or
contract (refer to Section 3.10).
SCG Consulting Engineers Page 5 SCG Ref: 33114(SWMP)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.