Changed Approval MCU140060.01
MCU14/0060.01
ENGINEERING
General
11. The developer must meet any costs to repair damage to any Council or public asset
during construction, where damage is a result of the development works. Damage to
assets must be repaired immediately where it creates a hazard to the community. In
circumstances where the damage does not create a hazard to the community, it must be
repaired immediately on completion of the works associated with the development. A
condition report including photographs of the frontage of the site should be completed
and kept for future reference and made available to Council if required.
Driveway and Internal Roads
12. Sealed crossovers must be provided for the two accesses to the site in compliance with
the following:
a. IPWEAQ Standard Drawing SEQ R-056.
b. Designed and certified by a RPEQ
c. Have a minimum width of 4.0m at the property front boundary line.
13. Internal roads must:
a. Have a minimum width of 3.0m and widened where necessary to provide passing
opportunities for vehicles using the site.
b. Be all weather construction (sealed or compacted gravel) suitable for the
anticipated traffic and load of vehicles using the site.
c. Be provided with adequate stormwater drainage that prevents undue erosion or
surface deformation or settlement.
Excavation and Filling
14. All earthworks shall be undertaken in accordance with the provisions of AS 3798
“Guidelines on Earthworks for Commercial and Residential Developments”.
Stormwater Drainage
15. Stormwater drainage works and water quality devices and measures must be provided
and maintained in accordance with the approved engineering plans and in compliance
with the Stormwater Quality Management Plan included in the Stormwater Drainage for
No 154 Holts Rd Cooroy Report dated 26 September 2014, Ref No: 1432 IWMP.doc,
prepared by Callaghan & Toth. Particular attention must be given to the construction
and maintenance regime of the two proposed Sediment Basins. The drainage works
and basins must be certified by an RPEQ on completion.
16. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site, the dam or any adjoining property.
Erosion and Sediment Control
17. The developer must ensure non-essential, short or long term, exposure of soil is
prevented by minimising the duration of soil exposure to adverse weather conditions and
effectively turf or stabilise any exposed area without delay and prior to rainfall occurring.
18. The developer must ensure sediment does not leave the site or enter onto adjoining
properties or the dam on the site due to surface runoff on tyres of vehicles and/or
machinery. The developer must implement appropriate approved erosion and sediment
control measures throughout the site during all phases of construction and the ongoing
operation of the site.
Page 3 of 7