Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

UPDATED DA - Attachment 9B - Preliminary Engineering Plans

of 22

Plans and drawings: the text below has words only, no drawings.

Very large file (50.0 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                       IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                                                                                                   CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                                                  AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                                                                     ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                                                                                                                                                                                       COMMENCEMENT OF EXCAVATION
                                                                                                                                                                                      PROP
                                                                                                                                                                                           O
                                                                                                                                                                                      HES B SED
                                                                                                                                                                                           ASIN

                                                                                               CLEANAWAY
                                                                                                 DEPOT

                                                                                                                                                                                                                                         CURRENT GREEN
                                                                                                                                                                                                                                           WASTE AREA,
                                                                                                                                                                                                                                          FUTURE SCRAP
                            SITE ENTRANCE
                                                                                                                                                                                                                                         METAL STOCKPILE
                                                                                                                            REVIVA                                                   ACCOUNT                                                  AREA
                                                                                                                            CENTRE                                                  CUSTOMER
                                                                                                                                                                                   WEIGHBRIDGE                                                                           CURRENT GREEN
                                                                                                                                                                                                                                                                          WASTE AREA,
                                                                                                                                                                                                                                                                        FUTURE CONCRETE                                           EXISTING BOREHOLE TO BE
                                                                                                                                                                                                                                                                         CRUSHING AREA                                           RAISED TO SUIT ULTIMATE FSL




                                                                                                                                                                      PUBLIC                             CURRENT CONCRETE
                                                                                                                                                                   WEIGHBRIDGE                           CRUSHING AND SCRAP
                                                                                                                        TRANSFER                                                                        METAL STOCKPILE AREA,
                                                                                                                        STATION                                                                           PROPOSED FUTURE
                                                                                                                        BUILDING                                                     RRA                COMPOST FACILITY AREA
                                                                                                                                                                                     PAD

                                                                                                                                                                                                                                                                                                                      FUTURE
                                                                                                                                                                                                                                                                                                                     LANDFILL
                                                                                                                                                                                                                                                                                                                      CELL 3.1

                                                                                                                                                                                                            ACCESS ROAD
                                                EUMUNDI-NOOSA ROAD




                                                                                                                                         EXISTING
                                                                                                                                     TRANSFER STATION

                                                                                          FUTURE BUILDING




                                                                                                                                                                                                                               PROPOSED SOLAR FARM




                                                                         LEACHATE TANK FARM TANK STORAGE
                                                                           TO BE ITERATIVELY REVIEWED AND
                                                                                                                                                                                                                                                                                                                                                                    FUTURE
                                                                             REVISED DEPENDING ON SITE
                                                                                                                                                                                                                                                                                                                                                                   LANDFILL
                                                                            OPERATIONS. ALLOCATION TO BE
                                                                                                                                                                                                                                                                                                                                                                   CELL 3.2
                                                                         MADE/MAINTAINED FOR EXTENSION TO
                                                                         NORTH EAST OF EXISTING STRUCTURE




                                                                                                                                                                                                                                                                                          EXISTING
                                                                                                                                                                                                                                                                                          LANDFILL

                                                                                                                                                                                                                                                                                                                                        SCALE 1:1000 (A1) - 1:2000 (A3)

                                                                                                                                                                                                                                                                                                                                   Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                                   Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                                   Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                                   Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                                                                   the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                                   services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                                                   contractor prior to commencement of works.

                                                                                                                                                        Approved
Checked -    CJT                                                                                                                                                                                             Drawing title -                               Project -   DOONAN RESOURCE               Site -                      Project No.     244035       Sheet No.             C1000
Design -    CJT         Drawn -     KR
                                                                                                                                                                                                             SITE MASTERPLAN                                           RECOVERY REDEVELOPMENT        561 EUMUNDI-NOOSA ROAD,     Digital Ref :   C1000 SITE MASTERPLAN    Issue :        A
Scales -    AS SHOWN                                                                                                                                    COVEY ASSOCIATES PTY LTD    124 DUPORTH AVENUE                                                     Client -
                                                                                                                                                                                                                                                                       NOOSA SHIRE COUNCIL           DOONAN                        This Document is copyright and shall not be copied
                                                                     A   18.02.2025   PRELIMINARY ISSUE           CJT
                                                                                                                                                        ABN 59 137 305 992          PO BOX 16                                                                                                                                      without written approval, nor shall it be used except
Document Stage -       PRELIMINARY                                                                                                                      (07) 5443 7777              MAROOCHYDORE QLD 4558                                                                                                                          for the Development and the Site Specified.
                                                                     Issue Date                     Description   By                                    [email protected]
       c:\12dS\data\12dserver\244035_3605\design (covey)\drawings - concept design\uncontrolled\C1000 SITE MASTERPLAN.dwg                                                                                                                                                                                                        Plot 24 February 2025 - 11:31 AM
Log in to download the original file

UPDATED DA - Attachment 9B - Preliminary Engineering Plans.pdf · 50.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.