Skip to the record
The only place to find full transcripts.

Original source · versioned page text

UPDATED DA - Attachment 9B - Preliminary Engineering Plans

of 22

Plans and drawings: the text below has words only, no drawings.

Very large file (50.0 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                                         IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                                                                                                                     CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                                                                    AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                                                                                       ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                                                                                                                                                                                                         COMMENCEMENT OF EXCAVATION




                                                                                                                                                                                                        CURRENT GREEN
                                                                                                                                                                           PROP                           WASTE AREA,
                                                                                                                                                                                O
                                                                                                                                                                           HES B SED                     FUTURE SCRAP
                                                                                                                                                       REVIVA                   ASIN
                                                                                                                                                       CENTRE                                           METAL STOCKPILE                CURRENT GREEN
                                                                                                                                                                                                             AREA                       WASTE AREA,
                                                                                                                                                                                                                                      FUTURE CONCRETE
                                                                                                   CLEANAWAY                                                                                                                           CRUSHING AREA
                                                                                                     DEPOT
                                                                                                                                                                                                                                                             CURRENT CONCRETE
                                                                                                                                                                                                                                                             CRUSHING AND SCRAP
                                                                                                                                                                                                                                                            METAL STOCKPILE AREA,
                                                                                                   SITE ENTRANCE                                                                                                                                              PROPOSED FUTURE
                                                                                                                                                                                                                                                            COMPOST FACILITY AREA



                                                                                                                                       TRANSFER                                                                                                                                FUTURE
                                                                                                                                       STATION                                                                                                                                LANDFILL
                                                                                                                                       BUILDING                                                                                                                                CELL 3.1

                                                                                                                                                                                  ACCESS ROAD




                                                                                                                                                                                                                                                                                                         EXISTING
                                                                                                                                                                                           PROPOSED SOLAR FARM                                                                                           LANDFILL
                                                                                                                                                                                                                                                                                                          CELL 2.1
                                                                                                            EUMUNDI-NOOSA ROAD




                                                                                                                                                  RU
                                                                                                                                                    TC                                                                           EXISTING
                                                                                                                                                        HR
                                                                                                                                                          OA                                                                     LANDFILL                         EXISTING                     FUTURE
                                                                                                                                                            D
                                                                                                                                                                                                                                  CELL 1.1                        LANDFILL                    LANDFILL
                                                                                                                                                                                                                                                                  CELL 2.2                    CELL 3.2




                                                                                                                                                                                                                                                                                                                                                                        DRIVE
                                                                                                                                                                                                                                                                                                                                                                     R HAY
                                                                                                                                                                                                                                                                                                                                                                       E
                                                                                                                                                                                                                                                                                                                                                                   WALT
                                                                                                                                                                                                                                                                                                                 FUTURE                HES BASIN
                                                                                                                                                                                                                                                                                                                LANDFILL
                                                                                                                                                                                                                                             EXPANSION CELL 1.1      EXPAN                                      CELL 3.3
                                                                                                                                                                                                                                                                              SION C
                                                                                                                                                                                                                                                                                    ELL 2.2



                                                                                                                                                                             EMU MOUNTAIN ROAD




                                                                                                                                                                                                                                                                                                                                                          SCALE 1:2000 (A1) - 1:4000 (A3)
                                                                                                                                                                                                                                                                     CLEAN WATER
                                                                                                                                                                                                                                                                    DIVERSION DRAIN                                                                  Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                                                     Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                                                     Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                                                     Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                                                                                     the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                                                     services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                                                                     contractor prior to commencement of works.

                                                                                                                                                                Approved
Checked -    CJT                                                                                                                                                                                                    Drawing title -                               Project -   DOONAN RESOURCE                         Site -                       Project No.     244035       Sheet No.             C1001
Design -    CJT         Drawn -     KR
                                                                                                                                                                                                                    COMPLETE SITE MASTERPLAN                                  RECOVERY REDEVELOPMENT                  561 EUMUNDI-NOOSA ROAD,      Digital Ref :   C1000 SITE MASTERPLAN    Issue :        A
Scales -    AS SHOWN                                                                                                                                            COVEY ASSOCIATES PTY LTD    124 DUPORTH AVENUE                                                    Client -
                                                                                                                                                                                                                                                                              NOOSA SHIRE COUNCIL                     DOONAN                         This Document is copyright and shall not be copied
                                                      A   18.02.2025   PRELIMINARY ISSUE                                         CJT
                                                                                                                                                                ABN 59 137 305 992          PO BOX 16                                                                                                                                                without written approval, nor shall it be used except
Document Stage -       PRELIMINARY                                                                                                                              (07) 5443 7777              MAROOCHYDORE QLD 4558                                                                                                                                    for the Development and the Site Specified.
                                                     Issue Date                      Description                                 By                             [email protected]
       c:\12dS\data\12dserver\244035_3605\design (covey)\drawings - concept design\uncontrolled\C1000 SITE MASTERPLAN.dwg                                                                                                                                                                                                                          Plot 24 February 2025 - 11:31 AM
Log in to download the original file

UPDATED DA - Attachment 9B - Preliminary Engineering Plans.pdf · 50.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.