Figure 3.2 – DRAINS Post-development catchments
The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
Table 3.1 Existing and proposed unmitigated site peak discharge rates
Wyandra Street
Qchange
A.E.P Qexisting Qproposed Qchange (%)
(m³/s) (m³/s) (m³/s)
1EY 0.024 0.027 0.003 13%
50% 0.029 0.029 0.000 0%
0.2 EY 0.044 0.045 0.001 2%
10% 0.053 0.053 0.000 0%
5% 0.061 0.061 0.000 0%
2% 0.070 0.071 0.001 1%
1% 0.078 0.078 0.000 0%
The site has only resulting in minor increases to peak run-off for less than half of the modelled storm events. With the
increase being a maximum of 3L/s, the impact to downstream drainage conditions will be insignificant and unlikely
to result in damage or nuisance to downstream properties and infrastructure. Attenuation is therefore not required
for the proposed development.
Project number 20220116
File RECOR Preliminary Stormwater Management Report - 20220116.docx, 2022-09-27 Page 8 of 14
Revision 1
Document Set7 ID:
P +61 521124368190
22141549
1003 recorconsulting.com
A 75 Noosa Drive, Noosa Heads, Qld 4567 E [email protected]
Version: 1, Version Date: 10/12/2025
18/10/2022
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (6 Martin Street - Recor SMP Sep2022.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.