6 Martin Street - Recor SMP Sep2022

From the archive 6 Martin Street - OPW Application.zip, inside Operational Works Application OPW26/0051 - 1&2/6 Martin Street Peregian Beach. File date in the archive: 2026-01-06 09:12.

of 23

Page text read automatically using OCR, there may be inaccuracies

                                                 Figure 3.2 – DRAINS Post-development catchments


       The results of the modelling against the range of design storms for the development under the existing and
       proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
       rates.
                                       Table 3.1 Existing and proposed unmitigated site peak discharge rates

                                                                            Wyandra Street
                                                                                                            Qchange
                                                 A.E.P               Qexisting    Qproposed    Qchange       (%)
                                                                     (m³/s)       (m³/s)       (m³/s)
                                                   1EY                0.024        0.027        0.003        13%
                                                  50%                 0.029        0.029       0.000          0%
                                                 0.2 EY               0.044        0.045       0.001          2%
                                                  10%                 0.053        0.053       0.000          0%
                                                   5%                 0.061        0.061       0.000          0%
                                                   2%                 0.070        0.071       0.001          1%
                                                   1%                 0.078        0.078       0.000          0%



       The site has only resulting in minor increases to peak run-off for less than half of the modelled storm events. With the
       increase being a maximum of 3L/s, the impact to downstream drainage conditions will be insignificant and unlikely
       to result in damage or nuisance to downstream properties and infrastructure. Attenuation is therefore not required
       for the proposed development.




      Project number 20220116
      File RECOR Preliminary Stormwater Management Report - 20220116.docx, 2022-09-27                                   Page 8 of 14
      Revision 1

Document   Set7 ID:
       P +61    521124368190
                    22141549
                     1003                                                                                                recorconsulting.com
                                         A 75 Noosa Drive, Noosa Heads, Qld 4567           E [email protected]
Version: 1, Version Date: 10/12/2025
                          18/10/2022

Log in to download the original (6 Martin Street - Recor SMP Sep2022.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.