Skip to the record
Every meeting, every word.

Original source · versioned page text

6 Martin Street - Recor SMP Sep2022

From the archive 6 Martin Street - OPW Application.zip, inside Operational Works Application OPW26/0051 - 1&2/6 Martin Street Peregian Beach. File date in the archive: 2026-01-06 09:12.

of 23

Page text read automatically using OCR, there may be inaccuracies

        STORMWATER QUALITY
       The following sections discuss the stormwater quality considerations for the construction and operational phase of
       the development.


            4.1. Construction Phase

                 4.1.1 Erosion and Sediment Control Measures
       During construction, it is necessary to manage stormwater run-off to avoid potential contamination of downstream
       waterways from sediments and other pollutants from the site. A range of best practice sediment and erosion controls
       should be implemented on the development to ensure negative impacts to the downstream receiving environment
       are mitigated.

       As the area being developed is below 2,500m², the development’s construction will be managed using best practice
       erosion and sediment control principles in line with the desired outcomes of Appendix 2 of the SPP (DERM, July
       2017), which are shown below in Figure 4.1.




                           Figure 4.1 SPP 2017 Construction Phase Stormwater Management Design Objectives

       A site-specific erosion and sediment control plan shall be prepared as part of a future submission for Operational
       Works approval. Suitable erosion and sediment controls for the site may include:

            1. Sediment fencing along downstream of the work areas within the site to prevent sediment from leaving the
               construction area.




      Project number 20220116
      File RECOR Preliminary Stormwater Management Report - 20220116.docx, 2022-09-27                                Page 9 of 14
      Revision 1

Document   Set7 ID:
       P +61    521124368190
                    22141549
                     1003                                                                                             recorconsulting.com
                                        A 75 Noosa Drive, Noosa Heads, Qld 4567         E [email protected]
Version: 1, Version Date: 10/12/2025
                          18/10/2022

Log in to download the original (6 Martin Street - Recor SMP Sep2022.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.