Original source · versioned page text
2021-03-15 GC Agenda - Item 9 - Attachment 5 - MCU19-0114 & RAL19 0027 Infrastructure Agreement (44 pages)
The original of this document is very large (38.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
290sq.m putting surface with rock
revetment wall on pond edge.
Extent and height of lake
edge protection subject to
engineering assessment and
recommendations.
Reshape fairway with gentle
undulations to drain to existing pond.
Reshape fairway mounding to deflect
running shots away from out-of-bounds.
Additional protective planting.
Existing tees to remain.
Relocated 13th green
approximately 300sq.m.
Tees for new 14th hole
5 0 5 10 15 20 25
SCALE: 1 : 1000 @ A3 size
DESIGN SKETCH
for new 300m 13th green
and 250m 14th hole
PREPARED BY:
DATE: DRAWING NO:
February 2020 G288.Sk.13/14
Document Set ID: 21379346
Version: 1, Version Date: 27/01/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.