New path for walking golfers
Concrete path with
turn-around for golf carts.
350sq.m putting surface with rock
revetment wall on pond edge. Subtle
step in green to rear terrace.
Reshape fairway with gentle
undulations to free drain to new pond.
Enlarge and reconfigure watercourse.
WL 110
Existing path for walking golfers
New social tees.
O O B
Bio-basin detention required
either as part of pond or between
17th hole and resort boundary.
Tees for new 17th hole
5 0 5 10 15 20 25
SCALE: 1 : 500 @ A3 size
WL 110.5
DESIGN SKETCH
Mens and for new 16th hole
Ladies 17th
tees. & 15th green
PREPARED BY:
New 15th green,
bunker and rock DATE: DRAWING NO:
wall to pond. February 2020 G288.Sk.16/15
Document Set ID: 21379346
Version: 1, Version Date: 27/01/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.