Original source · versioned page text
2021-03-15 GC Agenda - Item 9 - Attachment 5 - MCU19-0114 & RAL19 0027 Infrastructure Agreement (44 pages)
The original of this document is very large (38.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
New Practice Putting Green 620sq.m New 430sq.m putting surface with steep bank in front and
subject to detailed design. deep bunkers to left, subject to detailed design.
New fairway shaped in accordance
with detailed design.
Reconfigure existing ponds in
accordance with new hole design
drawings.
Proposed cart path.
Extend new cart path to
17th fairway.
Combined 380sq.m 18th
hole teeing surfaces.
5 0 5 10 15 20 25
SCALE: 1 : 500 @ A3 size
PREPARED BY:
DESIGN SKETCH
for new 18th hole
170m par 3 DATE:
February 2020
DRAWING NO:
G288.Sk.18
Document Set ID: 21379346
Version: 1, Version Date: 27/01/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.