Original source · versioned page text
2021-03-15 GC Agenda - Item 9 - Attachment 5 - MCU19-0114 & RAL19 0027 Infrastructure Agreement (44 pages)
The original of this document is very large (38.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Reconfigure existing ponds.
Approximately 370sq.m putting surface
protruding into pond to create difficult
rear pin placement.
Earthworks to lower fairway at brow of
hill and use material to construct
mounding in front of Gemlife clubhouse.
Proposed tree planting to
separate 15th and 17th fairways.
New bunkers to be visible
from 17th tees.
New cart path
Proposed 17th hole tees.
Proposed 15th hole
green, bunker and rock
5 0 5 10 15 20 25 edge to pond.
SCALE: 1 : 1000 @ A3 size
DESIGN SKETCH
for new 17th hole
PREPARED BY:
DATE: DRAWING NO:
February 2020 G288.Sk.17
Document Set ID: 21379346
Version: 1, Version Date: 27/01/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.