Skip to the record
For the highest quality transcripts.

Original source · versioned page text

13. Appendix I - Integrated Water Mangement Plan

of 107

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (61.2 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 17, section 1. The text section number identifies this passage in the reader.

                                                                                 Integrated Water Management Plan
                                                                         Noosa Marketplace : 2-20 HOFMANN DRIVE



5.2          Proposed Stormwater Quality Treatment
5.2.1        Summary
The proposed stormwater quality treatment for the site consists of Ocean Guards (OG) on all inlets, two
Jellyfish (JF) treatment systems and three rainwater tanks. The rainwater tanks are shown in Figure 5-1. It can
be noted that the tank locations are indicative and are intended only to show the roof areas to be drained to
the tanks. The actual tank locations will be determined during the detailed design.
The specifications of the Ocean Guard and Jellyfish components are in Appendix C.
The characteristics of the rainwater tanks are outlined in 0.




Figure 5-1     MUSIC Model Tank Locations




V190428 | 15 May 2019 | Commercial in Confidence                                                              15
Log in to download the original file

13. Appendix I - Integrated Water Mangement Plan.pdf · 61.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.