                                                                                                 Integrated Water Management Plan
                                                                                         Noosa Marketplace : 2-20 HOFMANN DRIVE



Table 5-1       Rainwater Tanks MUSIC Details

 Parameter                                   Tank 1           Tank 2           Tank 3
 Volume below overflow pipe (kL)               50               25              2.0
 Depth above overflow (m)                     0.2               0.2             0.2
 Surface Area (sq m)                           10                5               5
 Initial Volume (kL)                           10               10               1
 Overflow pipe Diameter (mm)                   50               50              50
 Max Drawdown Height (m)                        2                2              0.4
 Annual Demand (kL/yr)                        3910             1500             40
 Distribution                              PET - Rain        PET - Rain     PET - Rain



5.2.2       MUSIC Model
A MUSIC (Ver. 6.3) model was set up to determine the efficiency of the stormwater quality treatment train
proposed for the development. The meteorological data adopted for the site was from the Cooroy Composite
weather station as recommended in the MUSIC Modelling Guidelines – Version 1.0 2010 (Water By Design,
2010), for the 11 year period from 01/01/1973 through to 31/12/1983.
The MUSIC source node characteristics were based on the values for commercial developments, as outlined
in the MUSIC Modelling Guidelines (Water By Design, 2010). The adopted source node characteristics are
summarised in Table 5-2 and Table 5-3 . The MUSIC model layout is shown in Figure 5-2 with catchments
shown in Figure 5-3.
                Rainfall Runoff Parameters for Commercial Source Nodes

 Parameter                              Value

 Rainfall threshold (mm)                1

 Soil storage capacity (mm)             18

 Initial storage (% capacity)           10
 Field capacity (mm)                    80
 Infiltration capacity coefficient a    243
 Infiltration capacity exponent b       0.6
 Initial depth (mm)                     50
 Daily recharge rate (%)                0
 Daily baseflow rate (%)                31
 Daily deep seepage rate (%)            0

                Pollutant Export Parameters for Commercial Source Nodes

 Parameter      Surface Type        TSS mg/L         TP mg/L         TN mg/L
                Roof                0                0               0
 Baseflow
                Roads               0.78             -0.6            0.32
                Roof                1.30             -0.89           0.37
 Stormflow
                Roads               2.43             -0.30           0.37




V190428 | 15 May 2019 | Commercial in Confidence                                                                              16
Log in to download the original file

13. Appendix I - Integrated Water Mangement Plan.pdf · 61.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.