Original source · versioned page text
13. Appendix I - Integrated Water Mangement Plan
Plans and drawings: the text below has words only, no drawings.
Very large file (61.2 MB): may take a few minutes to open.
Original PDF page 29, section 3. The text section number identifies this passage in the reader.
8.
.7
BA
32
9.61
7
9.61
NK
9.63
9.78
10
9.65
9.68
TBM 10 .5 8
BLOCK
BO
10 10 .5 5
WALL
IL9.46
TT
Nail in Top of Kerb .7
6 .68
OM
9.723m AHD
CONCR ETE
RETAINING
OF
9. 59
9.48
9. 57
9. 70
BA
NK
10
43 10 .5 1
42
9.
9.61
.4 8
9.48
9.
10
9.51
8.77 .6 2
38
9.63 9.5
9.
ELP
9.32 9.363 9.35
INVER
LIP OF
9.29 9.3 9.48
10 EP
IL9.32
8. 84
9.46 10 .6 6 10.
T OF KERB
9.42
9
8. 28 .6
CHANNEL
5
.2
4
9.42
0 10
7.99 8.5 8.
42
85
9.33
.1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.