Original source · versioned page text
13. Appendix I - Integrated Water Mangement Plan
Plans and drawings: the text below has words only, no drawings.
Very large file (61.2 MB): may take a few minutes to open.
Original PDF page 29, section 4. The text section number identifies this passage in the reader.
9.29
IL8.
8.0
9.41
10
9.44
8. 23
9.18
10.32
8.25 ST
10
BACK OF
9.46
ON
9.33
9.35
E& 9.4 10 .39
10.27
8
EE
RE CO
8.13 10 .35
INVERT
LIP OF CHANN
TA NC
INING RE .49
8.13 TE
UPRIGH
8.1
BACK
WA
8.58 7 LL 8. 72
9.44
10.16
OF KERB
16
10.08
9.81 8.5 7.81 10
OF UPRIG
IL8.
9.91 8. 16 .55
NIE
T KERB
8.03
9.81 8. 62
EL
10
8.08 .6 0
8.06 8.09
10
HT KERB
10.04
9.92
9. 05 8. 72 10 .28
CONCRETE PATH
8.90 .2
9.18
9.15
9.5 10 5
9.27
8.54 .39
8.5
8.12 8.09
8. 10
IL8.12 71 .0
99
8.14
9.88
8. BO
8.80
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.