Skip to the record
The only place to find full transcripts.

Original source · versioned page text

13. Appendix I - Integrated Water Mangement Plan

of 107

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (61.2 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

                                                                                  Integrated Water Management Plan
                                                                          Noosa Marketplace : 2-20 HOFMANN DRIVE




2            Site Description and Proposed Development

2.1          Site Description
The site has an area of approximately 3.58 ha, of which approximately 1.4 ha will be developed into retail
outlets and associated commercial use. The development is to be zoned as ‘Shire Business Centre’ in
accordance with the Noosa Plan Zones 2016. The subject site is bounded by existing commercial/light
industrial use to the west, Hofmann Drive to the east, with Eenie Creek Road running alongside the northern
boundary. Currently, the area is densely grassed, with a general fall towards the southern boundary. Existing
levels vary from RL 9.0 mAHD at the northwest corner of the site, to RL 6.0 mAHD on the southern boundary.
Located nearby is the Noosa Civic Shopping Centre to the east. Figure 2-1 shows the site locality/boundary.




Figure 2-1     Subject Site Location


2.2          Land Encumbrances
Both lots are subject to a number of easements and covenants. Located on the northern boundary of the
subject site, and adjoining the eastern edge alongside Hofmann Drive, is an environmental covenant to
preserve native vegetation on site. Running through the site from north to south is a drainage easement
designed to capture overland flow from the wider catchments and discharge into the downstream
environmental reserve. Finally, located to the south of the site, on the eastern boundary is an environmental
covenant to preserve native vegetation. It is noted that this land cannot be cleared or used to treat stormwater
flows discharging from the site. The existing easement and covenant plan is located in the development
drawings (Appendix A). It is assumed that the easements noted above will be modified to suit the proposed
development as required.

V190428 | 15 May 2019 | Commercial in Confidence                                                                4
Log in to download the original file

13. Appendix I - Integrated Water Mangement Plan.pdf · 61.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.