Council archive · source document
Approved Plans - MCU22-0135 · MCU22/0135
Plans and drawings: the text below has words only, no drawings.
NO
RT
H
Parapet Wall
Colorbond Trimdek 2° Pitch DP (x2)
Parapet Wall
m
sq
Parapet Wall
Parapet Wall .0
: 17
DP (x2) ea
Colorbond Trimdek 2° Pitch sqm Ar
: 1 7 .0
A re a
DPS (x2) DP DP DP DPS (x2) DP (x2)
Outside Of Wall Below (Orange)
Outside Of Wall Below (Orange)
Colorbond Custom Orb 5° Pitch
Colorbond Custom Orb 5° Pitch
m
sq
S.L .1
: 74
ea
Ar
s qm
8 6 .1
e a:
Ar S.L
m
m
sq
1 sq
Outside Of Wall Below (Orange)
.3
36
: 5 2.
:1
ea
S.L
A re a
Ar
Outside Of Wall Below (Orange) Approx Size and Location of Select Solar
System to owners / builders detail.
Outside Of Trusses Below (Pink)
Colorbond Custom Orb 5° Pitch
Select Velux Skylights installed to
manufacturers specification. (S.L)
GENERAL NOTES
Roof Construction General Notes
Parapet Wall
Colorbond sheet metal to be fixed in Icon Building Design has provided downpipe
S.L accordance with manufacturers specification. locations as a guide only.
All ridge capping, steps, hips valleys and Layout to be checked for compliance by
vent flashings to provide waterproofing system. qualified persons prior to ordering and
construction.
Outside Of Wall Below (Orange) Outside Of Trusses Below (Pink) Provide reflective foil backed sarking to All slotted gutters and downpipes to be
underside of roof sheeting. Colorbond installed to NCC and or AS3500 (relevant
guttering and PVC Downpipes to be parts).
connected to Stormwater systems in
accordance with the local authority. Materials used are to be compatible with all
components upstream and down stream.
Roof water requirements and calculations Position of proposed building to
are provided as a guide. Ensure a be verified by builder on site.
qualified plumber/ hydraulics consultant reviews Location of existing services to be
the downpipe layouts prior to construction. verified by builder prior to construction.
Downpipe & Gutters Icon Building Design has provided downpipe
Rainfall Intensity 20 year ARI : 253 locations as a guide only.
Roof catchment area : As Shown Layout to be confirmed by qualified persons
Effective area of eaves gutter :5875mm² prior to construction.
SITE PLAN - ROOF DRAINAGE Slope: greater or equal : 1:500
Downpipe size : DP : 100mm
Scale : 1 : 100
DPS : 100mm
NOOSA COUNCIL
Revision Schedule Project Address : Sheet Name: Project Status: Project Number: Maximum catchment per downpipe :
Number Description Date Issued by No. 49 Donnellys Road, Ridgewood Roof Drainage WD 20-060 DP : 45m² APPROVED PLAN
1 WD 20/01/20 BJH DPS : 45m²
Email: [email protected]
Client Name : Project Issue Date : Q.B.C.C Lisence No. Sheet Number: Number of downpipes : As shown
MCU22/0135 7 OCT 2022
Website: www.iconbuildingdesign.com.au Rhys & Monique 20/01/2021 126221 15
Document Set ID: 22061202
C COPYRIGHT The Drawing and the design depicted on this sheet remains the property of Icon Building design. Reproduction in part or whole is prohibited unless written permission is obtained from Icon Building Design. Plans are design for use on the job address specified in the titleblock only.
Version: 1, Version Date: 04/08/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - MCU22-0135.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.