Skip to the record
Search everything, all in one place.

Original source · versioned page text

Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 12, section 1. The text section number identifies this passage in the reader.

Noosa Shire Council – The Noosa Plan
Driveways and Carparking Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                          ACCEPTABLE OUTCOMES                                          COMMENTS


                                                                S3.2                                                                         ✓
                                                                Driveways are located so they abut existing driveways of
                                                                adjoining development where practicable and reciprocal
                                                                                                                            Refer to architectural plans
                                                                easements are created to reduce the sealed driveway         prepared by Nettleton Tribe for
                                                                width.                                                      details.
                                                                                                                            To be complied with at detailed
                                                                                                                            design / construction stages and in
                                                                                                                            accordance with Council DA and
                                                                                                                            OPW approval conditions.
  O4                                                            S4.1                                                                         ✓
  Vehicular access does not adversely impact on the             Footpath and kerb crossings are located clear of existing
  capacity, operations and maintenance of the existing          stormwater inlet structures, water and sewerage
                                                                                                                            To be complied with at detailed
  infrastructure;                                               infrastructure fittings, any other exiting utility          design / construction stages.
                                                                infrastructure, existing landscaping and vegetation.

 O5                                                            S5.1
 Vehicular access does not adversely impact on the health      Vehicular access avoids disturbance to the tree protection
 and integrity of existing landscaping or native vegetation,   zone of trees on public land.
 where possible.
 O6                                                            S6.1 For—                                                                     ✓
                                                                a)   Ancillary dwelling unit, Multiple housing Type
 Driveway run-off is filtered prior to leaving the premises.         2 if less than 5 carparking spaces, Visitor            To be complied with at detailed
                                                                     accommodation Type 1 and Home- based                   design / construction stages.
                                                                     business Type 3—the driveway is formed to drain
                                                                     to landscaped areas; and



 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 3 of 8
July 2017
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.