Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 18, section 1. The text section number identifies this passage in the reader.

Noosa Shire Council – The Noosa Plan
Earthworks Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                            ACCEPTABLE OUTCOMES                                              COMMENTS

  14.119 Effects of works
  Drainage                                                       S1.1
 O1                                                              The finished surface gradient of any filled or excavated
                                                                                                                                                    ✓
                                                                 area is within the range 0.5% to 1.5% and drains to
 Finished surface levels ensure land is free draining.           Council’s stormwater infrastructure where available or
                                                                 where stormwater infrastructure is not available, toward the     To be complied with at detailed
                                                                 street.                                                          design / construction stages.
   Hydraulics                                                    No solution provided.                                            N/A
 O2
 Any change to the level of the land does not have an adverse                                                                     Site not affected by flooding
 flooding impact on the flooding and drainage characteristics
 off-site.
   Geotechnical considerations                                    For assessable development—                                                       ✓
   O3                                                             S3.1
   Earthworks do not result in geotechnical instability on the
                                                                  Filling works are undertaken in accordance with                 To be complied with at detailed
   premises or nearby premises.
                                                                  Section 2.8- Filling of Site of Council’s PSP5 -
                                                                  Engineering Design Standards- Roads and Drainage &
                                                                                                                                  design / construction stages.
                                                                  Earthworks
                                                                  S3.2                                                                              ✓
                                                                  Where the filling is for residential commercial or industrial
                                                                  purposes the works comply with Australian Standard -
                                                                  Guidelines for earthworks on commercial & residential           To be complied with at detailed
                                                                  development.                                                    design / construction stages.
  Local amenity                                                   S4.1                                                                              ✓
  O4                                                              The following control measures are
  Earthworks do not cause disturbance to the amenity of the       implemented—
  neighbouring land.                                                  a) regular water spraying of exposed areas to



 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 1 of 5
July 2017
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.