Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

Noosa Shire Council – The Noosa Plan
Earthworks Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                           ACCEPTABLE OUTCOMES                                           COMMENTS
                                                                         suppress dust;                                       To be complied with at detailed
                                                                     b) provision of dust stabilised or sealed internal       design / construction stages.
                                                                         roads;
                                                                     c) protective covering of exposed areas that are
                                                                         left for more than 2 weeks; and
                                                                     d) if there is no valid development permit for the
                                                                         site, disturbed areas are revegetated using
                                                                         species identified in PSP3 - Landscaping
                                                                         Plants and Guidelines;
                                                                 S4.2                                                                          ✓
                                                                  Earthworks are undertaken only during the hours of 7am
                                                                 to 6pm, Monday to Friday and 7am to 6pm on Saturday.
                                                                 No work is undertaken on Sunday or public holidays.          To be complied with at detailed
                                                                                                                              design / construction stages.
  Vegetative Waste                                               S5.1                                                                          ✓
 O5                                                              Cleared vegetation is transported off-site for disposal in
                                                                 an approved green waste disposal facility;
 Vegetation cleared from a development site is disposed of in                                                                 To be complied with at detailed
 an environmentally responsible manner.                                                                                       design / construction stages.
                                                                 S5.2                                                                          ✓
                                                                 Cleared vegetation is mulched on-site and reused for
                                                                 landscaping of the finished development;
                                                                                                                              To be complied with at detailed
                                                                                                                              design / construction stages.
                                                                S5.3                                                                           ✓




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 2 of 5
July 2017
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.