Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 20, section 1. The text section number identifies this passage in the reader.

Noosa Shire Council – The Noosa Plan
Earthworks Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                              ACCEPTABLE OUTCOMES                                               COMMENTS
                                                                   Cleared vegetation is disposed of for the purpose of              To be complied with at detailed
                                                                   firewood. (Note: Disposal of vegetative waste by burning off      design / construction stages.
                                                                   is not an acceptable method of disposal).
  Managing contamination risk                                       S6.1                                                                              ✓
 O6                                                                 The fill material is solid clean earth, free of putrescible or
                                                                    refuse material, vegetation, acid sulfate soils, building or
 Materials used as fill are suitable for development of the land    construction material or other material or contaminants;         To be complied with at detailed
 and filling or excavation works do not result in the                                                                                design / construction stages.
 contamination of land.
                                                                   S6.2                                                              N/A
                                                                   The site is not on the contaminated land register.
  Haulage activity and amenity                                                                                                                        ✓
  O7                                                                No solution provided
  Haulage of material to and from a site ensures—
  a) minimal disturbance to neighbouring properties                                                                                  To be complied with at detailed
      and properties along the haulage route; and                                                                                    design / construction stages.
  b) Council’s road infrastructure including
      pavements is not adversely affected.

  Extent of earthworks                                              S8.1                                                                              ✓
  O8                                                                All earthworks, including cut and fill batters, retaining
  Earthworks are contained within the subject                       walls etc are contained within the subject site.
  property.                                                                                                                          To be complied with at detailed
                                                                                                                                     design / construction stages.




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 3 of 5
July 2017
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.