Appendix F. Civil Engineering Report Part 2
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 23, section 1. The text section number identifies this passage in the reader.
Noosa Shire Council – The Noosa Plan
Erosion and Sediment Control Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
14.124 Effects of works
Erosion and drainage control, sediment capture S1.1
and stormwater runoff Construction works are designed, planned and
✓
O1 executed with respect to the principles of erosion
reduction, drainage management and sediment capture
Development design, density, layout, and staging provide for in accordance with Appendix 2, Table A of the To be complied with at detailed
erosion control, drainage control and sediment capture and Queensland State Planning Policy and International design / construction stages.
treatment during the construction phase. Erosion Control Association Best Practice Erosion and
Sediment Control (BPESC) 2008;
S1.2 ✓
Construction works are designed and managed to restrict
the extent of clearing and soil exposure to that necessary
for access, and safe construction; To be complied with at detailed
design / construction stages.
Refer to civil engineering report, in
specific stormwater quality section
prepared by this office.
S1.3 ✓
Clean stormwater is diverted or managed around or
through the site without increasing the concentration of
total suspended solids or other contaminants in the flow To be complied with at detailed
and without causing erosion (onsite or offsite); design / construction stages.
Refer to civil engineering report, in
specific stormwater quality section
prepared by this office.
Solution: ✓ = Acceptable Solution
A/S = Alternative Solution
N/A = Not applicable to this proposal
Page 1 of 3
July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.