Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 24, section 1. The text section number identifies this passage in the reader.

Noosa Shire Council – The Noosa Plan
Erosion and Sediment Control Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                         ACCEPTABLE OUTCOMES                                              COMMENTS
                                                               S1.4                                                                              ✓
                                                               Cleared areas are effectively stabilised prior to rainfall if
                                                               works are delayed or works are not intended to occur
                                                               immediately;                                                    To be complied with at detailed
                                                                                                                               design / construction stages.
                                                                                                                               Refer to civil engineering report, in
                                                                                                                               specific stormwater quality section
                                                                                                                               prepared by this office.
                                                               S1.6                                                                              ✓
                                                               For buildings,
                                                               a)   upstream runoff must be diverted around the
                                                                    construction site; and                                     To be complied with at detailed
                                                               b)   sediment barriers are provided downslope of                design / construction stages.
                                                                    disturbed areas to prevent sediment washing into
                                                                    gutters, drains and watercourses either on or off the      Refer to civil engineering report, in
                                                                    site; and                                                  specific stormwater quality section
                                                               c)   exposed soil and construction access must be               prepared by this office.
                                                                    managed in accordance with International Erosion
                                                                    Control Association Best Practice Erosion and
                                                                    Sediment Control (BPESC) 2008; and
                                                               d)   temporary or permanent downpipes are connected
                                                                    to the stormwater system before laying the roof; or
                                                               e)   localised erosion is avoided by directing flow from
                                                                    downpipes over non-erosive areas.
 O2                                                           S2.1                                                             N/A
 Works in a watercourse
                                                              Work within waterways must be undertaken in accordance
 Construction activities within watercourses are planned to
                                                              with Best Practice Erosion and Sediment Control, Appendix



 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 2 of 3
July 2017
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.