Noosa Shire Council – The Noosa Plan
Erosion and Sediment Control Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
S1.4 ✓
Cleared areas are effectively stabilised prior to rainfall if
works are delayed or works are not intended to occur
immediately; To be complied with at detailed
design / construction stages.
Refer to civil engineering report, in
specific stormwater quality section
prepared by this office.
S1.6 ✓
For buildings,
a) upstream runoff must be diverted around the
construction site; and To be complied with at detailed
b) sediment barriers are provided downslope of design / construction stages.
disturbed areas to prevent sediment washing into
gutters, drains and watercourses either on or off the Refer to civil engineering report, in
site; and specific stormwater quality section
c) exposed soil and construction access must be prepared by this office.
managed in accordance with International Erosion
Control Association Best Practice Erosion and
Sediment Control (BPESC) 2008; and
d) temporary or permanent downpipes are connected
to the stormwater system before laying the roof; or
e) localised erosion is avoided by directing flow from
downpipes over non-erosive areas.
O2 S2.1 N/A
Works in a watercourse
Work within waterways must be undertaken in accordance
Construction activities within watercourses are planned to
with Best Practice Erosion and Sediment Control, Appendix
Solution: ✓ = Acceptable Solution
A/S = Alternative Solution
N/A = Not applicable to this proposal
Page 2 of 3
July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.