Appendix F. Civil Engineering Report Part 2
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 29, section 1. The text section number identifies this passage in the reader.
Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
14.144 Strategic Transport Network
O1 S1.1 N/A
Traffic generation from the development is considered in a Where the development leads to the need to increase
localised and a Shire wide context to ensure that— transport infrastructure in the Shire, the development
contributes to the transport network in accordance with the
a) the transport network has the capacity to safely requirements of the applicable infrastructure charging
and efficiently accommodate projected instrument and the Priority Infrastructure Plan in
movements; and/or accordance with legislation.
b) the development includes measures to upgrade
the transport network to meet the imposed Editor’s note
demands. Council may for some development require the preparation
of a Transport Impact Assessment Report. Planning
Scheme Policy PSP1 details matters to be addressed in the
Report.
O2 S2.1 N/A
The street network has high street connectivity, both within Road planning and development design facilitates as many
the development and to the surrounding local area. Refer to traffic engineers report
pedestrian and cycle movements as possible and provides
supporting the development.
for future connectivity and integration with adjoining sites;
S2.2 N/A
Arterial and sub-arterial roads are designed so they
can operate with acceptable volumes of traffic during Refer to traffic engineers report
peak times; supporting the development.
S2.3 N/A
Collector and local streets are provided to support short
trips for local traffic moving in and between
Solution: ✓ = Acceptable Solution
A/S = Alternative Solution
N/A = Not applicable to this proposal
Page 1 of 16
July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.