Appendix F. Civil Engineering Report Part 2
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 38, section 1. The text section number identifies this passage in the reader.
Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
accommodate public transport services; S7.3
b) road pavement surfaces— On-road cycling treatment is utilised to provide safe
i. are durable enough to carry estimated wheel and continuous movement of cyclists along a
loads of travelling and parked vehicles; roadway, such as--
ii. provide for the safe passage of vehicles, a) sealed shoulders;
pedestrians, cyclists, and discharge of b) wide kerbside lane;
stormwater run-off from contributing c) exclusive or peak period bicycle lane;
catchments and the preservation of all weather d) advisory treatments such as Bicycle
access; Awareness Zone;
c) kerb and channel— e) shared parking / bicycle lane;
i. controls vehicle movement by delineating f) contra flow bicycle lane; and
the carriageway for all users; g) bus/bicycle lane.
ii. conveys road pavement run-off to stormwater
drainage in a manner that allows the road to be S7.4
trafficable in Q100 ARI local rainfall events; and The provision of bicycle lanes at intersections is
d) verges and footpaths provide— generally in accordance with AUSTROADS Part 14,
i. safe access for pedestrians and cyclists section 5 and the Manual of Urban Traffic Control
clear of obstructions; Devices (MUTCD) Part 9.
ii. an access area for vehicles onto
properties;
iii. a corridor allocated for services and utilities;
and
iv. additional amenity for minor roads.
O8 S8.1 Development will comply.
Stormwater drainage infrastructure is planned, Stormwater drainage planning, design and construction
designed and constructed to— is in accordance with Section 4 of PSP5 Engineering Refer to civil engineering report
a) be accessible, cost effective and easily Design Standards – Roads, Drainage and Earthworks; prepared by this office.
Solution: ✓ = Acceptable Solution
A/S = Alternative Solution
N/A = Not applicable to this proposal
Page 10 of 16
July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.