Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
maintainable; S8.2 Development will comply.
b) protect downstream capacity; As Constructed data is submitted in accordance with
c) protect downstream water quality; Section 6 of PSP5 Engineering Design Standards –
d) maximise on-site stormwater retention and Roads, Drainage and Earthworks;
retardation; and S8.3 ✓
e) convey run-off to stormwater drainage in a
Stormwater drainage planning, design and construction is
manner that allows roads to be trafficable in
Q100 ARI local rainfall events. in accordance with the Queensland Urban Drainage Design To be complied with at detailed
Manual. design / construction stages.
Refer to civil engineering report
prepared by this office.
O9 S9.1 ✓
Roads and stormwater drainage infrastructure is Roads and stormwater drainage infrastructure is
constructed— constructed in accordance with—
a) in accordance with appropriate a) Sections 2, 3 and 4 of PSP5 Engineering Design To be complied with at detailed
engineering standards; and Standards – Roads, Drainage and Earthworks; design / construction stages.
b) to minimise adverse environmental b) Queensland Design Code for Residential Streets;
impacts, including from run-off and c) AUSTROADS; or Refer to civil engineering report
erosion. d) A combination of the principles in these prepared by this office.
documents;
S9.2 ✓
Erosion and sediment control measures are designed
and implemented in accordance with the Institution of
Engineers Australia (Queensland Division) Soil Erosion To be complied with at detailed
and Sediment Control - Guidelines for Queensland design / construction stages.
Construction Sites.
Solution: ✓ = Acceptable Solution
A/S = Alternative Solution
N/A = Not applicable to this proposal
Page 11 of 16
July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.