Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 45, section 1. The text section number identifies this passage in the reader.

 PERFORMANCE OUTCOMES                                     ACCEPTABLE OUTCOMES                                         COMMENTS
  Maintenance of environmental values and water            S1.1
  quality objectives                                       Development meets the applicable performance
                                                                                                                                       ✓
 O1                                                        outcomes of the State Planning Policy Appendix 2 SPP
 Downstream ecosystems, properties and infrastructure      Code: Water Quality;
 are not adversely impacted by either changes to flow,                                                                To be complied with at detailed
 water quality or ecosystem health caused by                                                                          design / construction stages.
 development.
                                                                                                                      Refer to civil engineering report,
                                                                                                                      in specific stormwater quality
                                                                                                                      section prepared by this office.
                                                          S1.2                                                             Development will Comply.
                                                          Design and construction methods for stormwater quality
                                                          treatment assets are in accordance with Healthy
                                                          Waterways Water By Design Guidelines;                       To be complied with at detailed
                                                                                                                      design / construction stages.
                                                                                                                      Refer to civil engineering report,
                                                                                                                      in specific stormwater quality
                                                                                                                      section prepared by this office.
                                                          S1.3                                                             Development will Comply.
                                                          Commitments are made to implement a cost effective
                                                          maintenance strategy for the life cycle of any engineered
                                                          water quality treatment device;                             To be complied with at detailed
                                                                                                                      design / construction stages.

                                                                                                                      Refer to civil engineering report,
                                                                                                                      in specific stormwater quality
                                                                                                                      section prepared by this office.
                                                          S1.4                                                        N/A – site less than 2,500m2
                                                          Water quality nutrient load modelling is undertaken in      hence no treatment train
                                                          accordance with Water by Design Music Modelling             modelling required in accordance
                                                          Guidelines to demonstrate compliance with the SPP



 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 1 of 5
July 2017
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.