Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 46, section 1. The text section number identifies this passage in the reader.

 PERFORMANCE OUTCOMES                                         ACCEPTABLE OUTCOMES                                              COMMENTS
                                                              nutrient reduction requirements;                                 with SPP 2017.

                                                              S1.5                                                                              ✓
                                                              Stormwater outlets that directly discharge to naturally acidic
                                                              environments are managed to prevent eutrophication;
                                                                                                                               To be complied with at detailed
                                                                                                                               design / construction stages.

                                                                                                                               Refer to civil engineering report,
                                                                                                                               in specific stormwater quality
                                                                                                                               section prepared by this office.
                                                                                                                               Stormwater outlets directly into
                                                                                                                               existing Council infrastructure.
                                                              S1.6                                                                              ✓
                                                              Suitable methods are incorporated to prevent the spread of
                                                              invasive environmental weed species at stormwater outlets.
                                                                                                                               To be complied with at detailed
                                                                                                                               design / construction stages.

                                                                                                                               Refer to civil engineering report,
                                                                                                                               in specific stormwater quality
                                                                                                                               section prepared by this office.
  Water demand                                                 S2.1                                                                             ✓
  O2                                                           Captured water is plumbed to be available for all
  Urban development reduces the need for mains water by        external uses including gardening, irrigation, ponds
  capturing and utilising run-off from appropriate areas on    and outdoor cleaning.                                           To be complied with at detailed
  site.                                                                                                                        design / construction stages.




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 2 of 5
July 2017
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.