PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
O3 S3.1 Refer to landscape architects plans
Urban development reduces the need for mains water by Planting is in accordance with PSP 3 Landscaping
eliminating requirement for irrigation via the use the Plans and Guidelines. for further details.
endemic plant landscaping design.
O4 S4.1 ✓
Backflow devices or similar systems are installed, where A suitable backflow prevention device is installed to
necessary, to ensure water reuse facilities have no protect the drinking water within the reticulated water
impact on the quality of the town mains water. supply in accordance with AS/NZS 3500:2003 Plumbing To be complied with at detailed
and Drainage. design / construction stages.
Refer to hydraulic engineers plans
during detailed design phase.
Shire Business Centre No probable solution
O5
Within the Shire Business Centre site, as shown on Map
SBC run-off treatment is contained within the
developable areas of the site and drainage lines are only
used for final polishing of run-off;
O6 No probable solution
Within the Shire Business Centre site, as shown on Map
SBC, on-site detention measures are contained within the
developable areas of the site, clear of drainage lines and
Open Space Precincts.
Use of natural treatments and systems S7.1
O7 No probable solution
Natural treatment strategies, including grass swales and
bio-retention systems, vegetated filtration strips and
gross pollutant traps, are used wherever possible.
Solution: ✓ = Acceptable Solution
A/S = Alternative Solution
N/A = Not applicable to this proposal
Page 3 of 5
July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.