Original source · versioned page text
Appendix F. Civil Engineering Report Part 2
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 49, section 1. The text section number identifies this passage in the reader.
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
O10 S10.1 ✓
Development design and operation facilitates nil increase in Methods to prevent gross pollutants entering stormwater
gross pollutants entering stormwater systems. systems and waterways are adopted that—
a) are low maintenance; To be complied with at detailed
b) prevent nutrient leaching in the event scheduled design / construction stages.
maintenance is delayed; and
c) facilitate human behaviour change (e.g. Refer to civil engineering report,
signage, bins). in specific stormwater quality
section prepared by this office.
Solution: ✓ = Acceptable Solution
A/S = Alternative Solution
N/A = Not applicable to this proposal
Page 5 of 5
July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.