Original source · versioned page text
Appendix F. Civil Engineering Report Part 2
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 56, section 1. The text section number identifies this passage in the reader.
SCHEDULE 2—EROSION AND SEDIMENT CONTROL
Proposed Amendments August 2015
ASSESSMENT
The Noosa Plan
1. Preamble
Erosion and sediment control on building sites
Builders must not pollute the environment. The Environmental Protection Act provides for
penalties for persons or entities causing environmental harm.
Soil erosion on building sites can be a major source of sediment pollution (environmental
harm) in our watercourses. A single building site can lose up to four truckloads of soil in one
storm. Washed from the sites into stormwater drains, this sediment can cause flooding and
also affects the water quality and the fish stocks in our creeks, lakes and the Noosa River
system.
Preventing sediment run-off from building sites is one of a number of ways that Council and
industry are improving our watercourses.
Effective on-site erosion and sediment control provides the following benefits—
A better looking, more marketable site;
Improved wet weather working conditions;
Reduced stockpile losses;
Less mud and dust problems;
Reduced clean-up costs;
Fewer public complaints;
Better public image;
Cleaner watercourses; and
Better fishing and swimming in our nearby watercourses.
2. Erosion Hazard Assessment Form
Controlling Factors Points Score Checking
Predominant slope1 of the whole site, prior to
building works:
0 - 3% slope 0
>3% - 5% slope 1
>5% - 10% slope 2 1
>10% - 15% slope 4
> 15% slope 5
Soil type: (see 1 below)
Sandy soil/gravel 0
Sandy loam 1 2
1
The term ‘predominant slope’ is defined in Part 2 Section 2.12.
S2.1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.