Appendix F. Civil Engineering Report Part 2
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 57, section 1. The text section number identifies this passage in the reader.
Controlling Factors Points Score Checking
Clay loam 2
Proposed Amendments August 2015
The Noosa Plan
Clay soil 2
Anticipated duration of site disturbance: (see 2 below)
Duration < 2 weeks 0
2 weeks Duration < 3 months 2 2
3 months Duration < 6 months 4
Duration > 6 months 5
Month that works are undertaken: (see 3 below)
August, September 0
April, May, June, July, November, October 1 3
March December 2
January February 3
Offsite sediment control (i.e. down slope of the soil
disturbance):
Score 1 point if there is no purpose built, operational 1
and well maintained sediment traps (eg. sediment 0
basin, gross pollutant trap or purpose built wetland)
to catch sediment before it enters a water body with
environmental values (eg. creek, natural wetland,
river or bay) (see 4 below)
Run-off entering the site:
Score 1 point if stormwater run off entering the site is 1 0
not diverted away from the soil disturbance
Extent of site disturbance:
Score 2 points if building work requires reshaping of
the ground surface (eg. ‘cut and fill’ works) (see 5 2
below) 5
Score 5 points if the area to be disturbed is greater 5
than 600m²
Works within environmentally sensitive areas:
Score 11 points if the disturbance is within the banks
of a watercourse (see 6 below) 11
Score 5 points if the disturbance is within 50m of the 0
top of bank of a watercourse 5
Score 2 points if the disturbance is between 50m
and 100m of the top of bank of a watercourse 2
TOTAL SCORE (See 7 & 8 below) 13 LOW
Notes:
1. Where there is more than one type of soil on the site, select the category with the highest point value.
2. The time, from when the building site will first become vulnerable to erosion, to the time the soil will
be fully stabilised (eg. grassing).
3. If this time span covers more than one category, select the category with the highest point value.
Note that if there is no grass/vegetation cover on the site before building work has started, the time
span starts from the time this form is completed.
4. If you are not sure, score 1 point.
5. For the purpose of this form, ‘cut and fill’ works are those that will result in a steep batter or retaining
wall above and/or below the building slab, greater than 1 metre in height. If the building slab has
already been fully cut and stabilised (eg. grassed) during the subdivision stage, score 0 points.
6. Watercourse means any clearly identifiable creek, stream or river, whether flowing permanently or
intermittently.
7. For a high risk site, the total score is 14 points.
8. For a low risk site, the total score is < 14 points.
S2.2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.