Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 63, section 1. The text section number identifies this passage in the reader.

                                        Introduction
         Congratulations on your purchase of a SPEL Environmental Stormwater Quality Improvements Device.
           With proper care and by following a few simple guide lines your system will give you many years
                                                of dependable service.


                                            Important
Only qualified personnel should maintain, operate and repair you Stormwater system. Any wiring of equipment should be
                                          performed by a qualified electrician.


                                              Warning
Operation may cause injury. Take all necessary precautions, wear protective equipment, refer to Engineers Department.
                  For your own safety, read all instruction manuals prior to working on equipment.


                             Safety Precautions
                                • Follow all “occupation, health and safety” regulations.
         • Ensure maintenance personnel are aware of “Confined Spaces” guidelines, which must be followed.
              • Make sure that there is sufficient oxygen and that there are no poisonous gases present.
                       • Check the explosion risk before wielding or using electric hand tools.
                             • Do not ignore health hazards. Observe strict cleanliness.
                        • Ensure that the lifting equipment (where required) is in good condition.
       • All personnel who are to work with these systems should be vaccinated against diseases that can occur.
                                              • Keep a first aid kit handy.


                                   Health & Safety
       Maintenace should be carried out by a competent contractor in accordance with the above procedures.
                          Health and Safety at Work legislation and good building practice.
A warning notice should be visible at the top of each access shaft - ‘danger, harmful fumes’ and ‘ respirators should be
    worn in this tank.’ Before entering persons must be qualified in accordance with ‘confined space’ requirements




Information contained in this data sheet is approximate and for general guidance only. In accordance with the companies
  policy of constant improvement and development SPEL Products reserves the right to change the specification without
                                                      prior notice.
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.